InspectionChad and test all meter and relay action is correc1.docVIP

InspectionChad and test all meter and relay action is correc1.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
InspectionChad and test all meter and relay action is correc1

Inspection Chad and test all meter and relay action is correct. (3) sending acceptance 1. The power supply departments inspection qualified to send power supply to the interior, after check the electricity, the school is correct. 2. High voltage into the line switch, check whether the high voltage is normal. Transformer tank switch, to check whether there is electric transformer and low voltage into line switch, check the low voltage is normal. In other ark switch respectively. 3. The no-load running 24 h, no abnormal phenomenon, the acceptance formalities, the construction unit to use. Submitted at the same time the construction drawings, construction records, product certification specification, test report and other technical information. 1 h413022 transformer installation technology A, basis of acceptance Transformer in place before, first carried out on the basis of acceptance. Foundation should comply with the design requirements, the center and the elevation of track and wheel base should be consistent with each other, the specific requirements: orbital level error should not be more than 5 mm. The actual gauge gauge should not be less than design, error should not be more than 5 mm. Rail face design elevation error should not be more than plus or minus 5 mm. Second, the equipment out of the examination 1. When unpacking the case, according to the equipment list, check the transformer equipment technical documents and construction drawings specifications should be consistent with the design, accessories and spare parts is complete without damage. 2. The transformer appearance inspection without mechanical damage and deformation, paint in good condition, no rust. 3. The tank seal should be good, with transformer oil transportation, oil conservator oil level should be normal, the oil should be no leakage. 4. Insulation porcelain and epoxy resin casting without damage, defects and cracks. 5. Filling nitrogen or transformer dry air transportation, du

文档评论(0)

bguarfan + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档