* Lesson 2 Basic Well Completion Technology 2.1 Basic Completion Methods 2.2 Completion Procedure Each drilled wellbore awaiting completion is unique. Even nearby wells drilled to the same reservoir can have different depths, formation characteristics, and hole sizes. It follows, then, that a wide variety of equipment designs and procedures have been developed to provide safe, efficient conduits from subsurface reservoirs to the surface in different situations. In each case, the ideal completion design minimizes initial completion and operating costs, while providing for the most profita