沉埋隧道工程对环境的响
《土木工程专业英语》课程考核论文
系别:工程造价 班级:1118341 学号:111834110 姓名:付威 成绩:
Buried tunnel project on the environment
Abstract: a deeply buried tunnel far-reaching impact on the environment through the waterways with the sinking pipe related. Under the tunnel on the mainland in the region and the impact of surface water in the tunnel design and construction method of choice to play the most important role. In considering the impact of the recent construction of a problem is the need to trench excavation for the tunnel may appear to be contaminated soil. And transport