the dying temperature is slowly rising
the drying temperature is slowly rising, average hourly temperature rise control in 5 to 8 degrees.
(3) to strictly control the temperature in the drying, make it within the prescribed scope, dry the highest temperature should be determined according to the grades of insulating materials, general core and winding of the highest temperature should be controlled in 70 to 70 degrees Celsius.
(4) drying temperature is measured with a mercury thermometer is not allowed when using alcohol thermometer, resistance thermometer or temperature thermocouple.
(5) to measure and record regularly winding insulation resistance, winding temperature, environment temperature, dry power supply voltage and current. Determination must disconnect the power supply, lest produce risk.
(6) when the motor insulation resistance meet the specification requirements, at the same temperature stable after 5 hours, just think dry finish
Second, the motor installed
(a) motor installation requirements
1. The motor assembly in place, in order to prevent vibration, when installation should be between motor and the base liner hard a hard layer of wood or plastic and vibration control.
2. The four anchor bolt on all want to use spring washer, tighten the nut to tighten in a diagonal cross sequence, each as tight the nut to twist.
3. Wear a wire pole should be buried well before pouring concrete, connect the motor end of the steel pipe, pipe shall be not less than 100 mm from the ground, and should make it as far as possible close to the motor terminal box.
4. The level of motor correction in both horizontal and vertical. Available generally use level measurement, calibration of 0.55 mm thick pads under the pedestal of the steel, to adjust the levelness of the motor.
5. Steady loading motor gasket is generally not more than 3 pieces, gasket and foundation surface contact should be tight, motor base after the installation of secondary grouting.
(2) transmission device installation calibration
T
您可能关注的文档
最近下载
- 专业月嫂服务合同范本及注意细节.docx VIP
- 《煤化学》全套教学课件.pdf
- 铁路工程沉降变形观测作业指导书.docx VIP
- tsg zf001-2006 《安全阀安全技术监察规程》新.pdf VIP
- 2024年山东省淄博市高青县中考一模英语试题.docx VIP
- 2015款一汽大众高尔夫_汽车使用手册用户操作图示图解详解驾驶指南车主车辆说明书电子版.pdf
- 铁路工程沉降变形观测与评估技术2015年稿.pdf VIP
- JBL JBL专业 无线麦克风系统 VM200 用户手册.pdf
- 相贯体的投影与相贯线一相贯体及相贯线的概念相贯体两相交的立体相贯线相交立体表面的交线立体相贯三种情.ppt VIP
- 妊娠期心肺复苏中国急诊专家共识测试卷及答案.docx
原创力文档

文档评论(0)