- 2
- 0
- 约5.93万字
- 约 36页
- 2016-12-05 发布于河南
- 举报
六区脚手架施工案
10-YB-ISPⅡ-SHF-204扬子巴斯夫六区项目 IPS II Area 6 Project脚手架搭设施工方案Scaffolding Erection Executive Plan合同号: A4DT-90-C435//IPS-1000-20-435CONTRACTNO: A4DT-90-C435//IPS-1000-20-435编制:李青春prepared by : Li Qingchun审核:吴健雄reviewed by: Wu Jianxiong 批准:郭培深approved by:Guo Peishen南京南化建设有限公司Nanjing Chemical Construction Co., Ltd.Feb 20, 2010Table of Contents目 录工程概况 Project Introduction二、编制依据Reference三、脚手架各组成部件详细计算书Detail Calculation for Every Components of All Kinds of Scaffolding四.脚手架搭设施工工艺Scaffold Erection Procedure 五、脚手架搭设基本要求:Basic Requirement六. 脚手架搭设形式和图例 Type and Sketch for Scaffolds Erection七. 脚手架搭设安全要求及措施Safety Requirement and Measures八、脚手架的拆除Scaffolding Removal九.现场脚手架搭设管理机构Organization Chart of Scaffold Erection Management一工程概况 Project Introduction1. 扬子石化巴斯夫IPS II 六区改造扩建项目包含U1装置(循环水站扩建、15#变电所、循环水站管廊),U2装置(空压系统改扩建、空压站、9#变电站改造、仪表控制以及实验楼改造)RTTF公路终端罐区,SCTF蒸汽裂解罐区,中央罐区等。The work scope of area 6 in BYC IPS II is U1 Plant( cooling water station expansion, substation #15, cooling water station pipe rack), U2 Plant( compressed air system revamp, compressed air station, substation #9 revamp, instrument control and lab building revamp), RTTF ,SCTF and Central Tank Farm etc.2. 本工程以管廊钢结构安装、管道安装、管道试压吹扫、配电室/控制室盘柜安装、桥架安装、电缆安装、储罐安装、球罐安装等工作为主,为了工程施工顺利进行,高空作业必须搭设操作平台,施工过程中应严格遵照脚手架的搭设工艺、高空作业安全规程以及IET对本工程的规范要求,避免安全事故的发生和保障施工人员的人生安全是本工程的宗旨。为此编制本施工方案,以便保质保量的完成本分项工程。本工程脚手架搭设主要采用钢管扣件式脚手架和移动式脚手架两种,其中脚手架搭设形式主要以钢管扣件式悬挂脚手架和落地式脚手架为主。This project mainly involves modification of structural steel, piping and its pressure test, flushing and blowing, panel in power distribution room/ control room, cable tray and cable. Operation platform shall be erected for work at height to a smooth construction, steel sheeting plate shall be used for the segregation of production area from construction area, full hall steel plank scaffolding shall be performed on the top roof of some equipments. Fire proof cloth shall be provided for the required area in accordance with owner′s requirements. The whole constru
您可能关注的文档
- spss聚类分结果解释.ppt
- Unit1 Were is he from.ppt
- SQL SERER 2008 Express安装配置手册.doc
- NYD-JBODY)电子式击穿保险器.ppt
- VSAT卫星通远端站的.ppt
- PS输入和美化字.ppt
- TOP GP品管理系统.ppt
- Week 1 io Eng.doc
- Western作步骤.doc
- VOTO沃土无涂料简介.ppt
- 2025-2026学年天津市和平区高三(上)期末数学试卷(含解析).pdf
- 2025-2026学年云南省楚雄州高三(上)期末数学试卷(含答案).pdf
- 2025-2026学年甘肃省天水市张家川实验中学高三(上)期末数学试卷(含答案).docx
- 2025-2026学年福建省厦门市松柏中学高二(上)期末数学试卷(含答案).docx
- 2025-2026学年广西钦州市高一(上)期末物理试卷(含答案).docx
- 2025-2026学年河北省邯郸市临漳县九年级(上)期末化学试卷(含答案).docx
- 2025-2026学年河北省石家庄二十三中七年级(上)期末历史试卷(含答案).docx
- 2025-2026学年海南省五指山市九年级(上)期末化学试卷(含答案).docx
- 2025-2026学年河北省唐山市玉田县九年级(上)期末化学试卷(含答案).docx
- 2025-2026学年河北省邢台市市区九年级(上)期末化学试卷(含答案).docx
原创力文档

文档评论(0)