英文简历(电子工程师)ELECTRONICS.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
英文简历(电子工程师)ELECTRONICS

英文简历(电子工程师)ELECTRONICS 英文简历(电子工程师)ELECTRONICS ENGINEER(Experienced)? ?   Sandy Lin 15/F,TOWER2 ,BRIGHT CHINA,BUILDING1,BEIJING.      BACKGROUND SUMMARY   Over eleven years of extensive computer/electronics in both digital and analog electronics withspecific emphasis on computer hardware/ expertise in system and component supervisor responsible for installing/maintaining Arcnet LAN in assembly and C programming communication skills including written,verbal and interpersonal.      PROFESSIONAL WORK EXPERIENCE   Stevenson Data Systems,Los Angeles,CA 1981-1993   Components Evaluation Engineer 1992-1993   Responsible for the characterization and evaluation of, and approved vendors list for:Power supplies,oscillators,crystals,and programmable logic used in desktop and laptop and recommended quality components that increased product adn developed power supply test plan used for evqluating third party power with vendors to resolve problems associated with components advisor for to engineer II.      Design Evaluation Engineer 1990-1992   Evaluated new computer product designs ,solving environmental problems on prototype systems analysis on new computer profucts to ensure hardware,software and mechanical design hardware and software for PC,ISA bus programmable load board used for environmental reliability lift testing on computer /maintained 20 ,Arcnet LAN system and sub-system susceptibility to electrostatic discharge in order to meet IEC-801-2 industry complete power and load of computer system and subsystem to verify power and load estimations.      Assistant Engineer 1981-1990   Performed extensive hardware evaluation ion prototype computers,tested prototype units for timing violation using the latest state-of-the-art test equipment,digital oscilloscopes and logic emvironmental,ESD and acoustic and built a power-up test used to test prototype computers during cold boot.      EDUCATION   Bachelor of Science in Electrical Engineering   --University of So

文档评论(0)

170****0532 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8015033021000003

1亿VIP精品文档

相关文档