- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
數据模型与决策(运筹学)课后习题和案例答案008
Chapter 8Pert/cpm models for Project Management
Review Questions
8.1-1 The bid is for $5.4 million with a penalty of $300,000 if the deadline of 47 weeks is not met. In addition, a bonus of $150,000 will be paid if the plant is completed within 40 weeks.
8.1-2 He has decided to focus on meeting the deadline of 47 weeks.
8.1-3 An immediate predecessor is an activity that must be completed just prior to starting the given activity. Given the immediate predecessors of an activity, this activity then becomes the immediate successor of each of these immediate predecessors.
8.1-4 (1) the activities of the project; (2) the immediate predecessors of the activities; and (3) the estimated duration of the activities
8.2-1 (1) activity information; (2) precedence relationships; and (3) time information (duration)
8.2-2 In an AOA network, each activity is represented by an arc, while in an AON network, each activity is represented by a node. AON networks are being used here.
8.2-3 The bars in a Gantt chart show the scheduled start and finish times for activities in a project.
8.3-1 (a) A path through a project network is one of the routes following the arrows (arcs) from the start node to the finish node; (b) the length of a path is the sum of the estimated durations of the activities on the path; (c) the longest path is called the critical path.
8.3-2 (1) The actual duration of each activity must be the same as its estimated duration; and (2) each activity must begin as soon as all its immediate predecessors are finished.
8.3-3 The earliest start time of an activity is equal to the largest of the earliest finish times of its immediate predecessors.
8.3-4 A forward pass is the process of starting with the initial activities and working forward in time toward the final activities.
8.3-5 It is a last chance schedule because anything later will delay the completion of the project.
8.3-6 The latest finish time of an activity is equal to the smallest of the latest start times of
您可能关注的文档
最近下载
- 煤矿安全监测监控和人员定位系统主要监察内容.docx VIP
- 电能质量评估报告.docx VIP
- 2025年新安全生产法试题库及参考答案.docx VIP
- 某自来水厂运营管理项目服务方案(技术方案).doc
- 第二单元第二课《科技之光》课件-2025-2026学年人教版(2024)初中美术七年级上册+.pptx VIP
- 滴滴运营面试题目及答案.doc VIP
- 2026届高考写作指导:先行者与后来者作文主体段讲解.pptx VIP
- 9.冬雨季施工、已有设施和管线的加固、保护等特殊情况下的施工措施.docx VIP
- 涉爆粉尘企业重大事故隐患检查表.doc VIP
- 贵州省申请认定教师资格人员体检表.docx VIP
文档评论(0)