- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
layout method
Ground secondary network layont: in head point with total station coordinate lofting method, layout the set point, and then take a closed ring junction station, and some other test for right Angle and distance. Measurement of the test results accord with the engineering article 7.2.4 Ⅰ grid accuracy level architecture. The Angle error is less than + 5 \, relative error is less than 1/30000 of length. After inspection, establish ground control piles on the extension cord. Control piles with large pile pouring concrete, hand and foot pipe maintenance.
6.1.2.3.1.3.3 foundation pad, and the stage of secondary network layout
Methods of cushion and pile caps establish secondary network basically the same with the ground, in addition to the inspection of the closure, and audited with ground control pile pitch line.
Cushion with chalk line mark, secondary branch floor secondary branches in slab concrete construction at each point on the embedded embedded parts 200 x 200 mm, correct closure on the built-in parts of naturalization, determine the end point, 2 mm holes with copper, act as a benchmark for upper secondary network to transfer.
6.1.2.3.1.3.4 main secondary network layout
Main use of internal control method using laser vertical transmission, the lower part of the height by 2 kg pendant, apparatus and theodolite to pass up. When after the completion of the foundation construction, at the bottom of the foundation pit has been basically stable, above all when measuring for foundation pit outer axis, elevation control points of review, verify the control points, using a laser theodolite J2 - JDA, level DS3 will cast to zero elevation control points, axis layer board on the surface, and set up the building height control points and control axis control network system. Now formed independent system within the building, and external elevation, the axis control points into the structure of the deformation system, will serve as the building settlement, uneven s
您可能关注的文档
- Inteligent building research a review.doc
- Interational College谭彪.doc
- Interet和Intranet应用作业.doc
- Interus总线.doc
- Intesinal Disaccharidase.doc
- Interational students’ culture learning and cultural adaptation..doc
- In掺杂钛锶电子结构第一性原理研究.doc
- Interational Journal of Heat and Mass Transfer.doc
- IPHDSI高清高速球应用与发展分析.doc
- iphon照片恢复软件免费版.doc
原创力文档


文档评论(0)