- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
The front of the embedded anchor foundation pit, the cable wind rope force direction pit deep within the range of 2.5 times should not have cooking, cables, underground pipelines, etc.
(3) embedment anchor in the backfill, the application of the pure land hierarchical compaction compaction, or the height of the backfill should be higher than that of foundation pit ground 400 millimeter above, and shall not be flooded. After the completion of the anchor setting should be ready to take cover engineering records.
(4) embedment anchor block set, after the completion of loading rope buckle should be pre tensioning.
(5) the main anchor tensile test shall be comply with the design requirements before use.
(3) the mast use requirements and stability checking
1. The mast use requirements
(1) the use of the mast should be accordance with the provisions of the mast operation instruction not to use overload.
(2) the mast assembly should enforce the rules of the operating instructions, the straightness of the mast assembly should be less than one over one thousand of its length, and total deviation should not exceed 20 mm.
(3) the mast internode connection bolts, should be symmetrical cross, successive and should meet the specified torque values.
(4) the mast base should be according to the load and mast mast vertical position of the geological conditions and surrounding underground design.
(5) using tilt mast hoisting equipment, the slope may not exceed 15 degrees.
(6) when two sets of sling, sling common role on a lifting point, should add the balance device to balance monitoring.
(7) in the process of hoisting, shall be carried out to the straightness of mast structure.
2. Mast stability checking
(1) to check the stability of the mast
Large equipment hoisting operations, if does not use the mast mast specification range of performance parameters of the use of specific cases, the need to check the stability of the mast. Extension mast height more than, for examp
您可能关注的文档
- SCI论文作常用精彩句式汇总——辑文编译4013.doc
- SCI写作验 免叮当.doc
- SCADA统功能模块.doc
- SciFider(Chemical Abstract web).doc
- SCOR模案例分析.doc
- SDY82C互感器校验仪.doc
- SECTIN 1 ACUTE UPPER RESPIRATORY INFECTION AND ACUTE BRONCHITIS.doc
- Sectin C Fire Alarm_BUC2 Fire Fighting System_10.doc
- sensiivity test EMC issue FA report V1.10.doc
- senso-network国际论文的翻译-华侨大学通信工程 汪冰伦.doc
- The hat on net of application for leave of hospital of world cup drawing near sells.doc
- The Knase Assay protocal.doc
- The ifluence of exchange rate changes.doc
- The kowledge of Geomatics Engineering.doc
- The lng-term effect of posterolateral fusion in adult isthmic.doc
- The Lterature of Knowledge and the Literature of.doc
- The Mcrobiome.doc
- The min reducer 2.doc
- The pessure test.doc
- The Pwer of Cultural Communication.doc
文档评论(0)