《采矿工程毕业设计(论文)-七台河精煤集团公司新建四矿1.20Mta新井设计【全套图纸】》.doc

《采矿工程毕业设计(论文)-七台河精煤集团公司新建四矿1.20Mta新井设计【全套图纸】》.doc

摘 要 本设计矿井为七台河精煤集团公司新建四矿1.2Mt/a新井设计,共有5层可采煤层,分别是82#、、、、 Abstract This mine design is designed the No.4 coal mine of Xin Jian of Qi Taihe Coal Mining Group.This design production is 1.2Mt/a,altogether has 5 to be possible to pick the coal bed, respectively is 82#、 85#、87#、 90#、91#, average thickness is 2m,the shaft area of recoverable reserves is 142.2Mt, the length of service is 84.6a.The design uses two horizontal vertical shaft development, two working surfaces reach produce. Uses gathering coal bed union mining, the main roadway uses the 10t wire laying type electric locomotive to

文档评论(0)

1亿VIP精品文档

相关文档