- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Strengthen the settlement observation of nearby pipeline, timely data, ensure safety.
12, found that the surface monitoring records, buildings and pipelines around are abnormal, with analyzing, precipitation, when it is necessary to stop for reinforcement.
6.2.2.6.2.4 dewatering well control operation
6.2.2.6.2.4.1 precipitation test run
Before starting the precipitation operation, accurate determination of the wellhead and the ground elevation, the determination of static water level, arrange pumping equipment, cables and pipes for the commissioning, to ensure that the water pumping system in good condition. Out of the water should be in the area around the drain, and then discharged into the municipal pipeline outside, so as not to take water in situ permeability, influence precipitation effect, shall be immediately discharge of rain water in pit digging unit outside the pit, to minimize infiltration of atmospheric precipitation and water in the pit.
6.2.2.6.2.4.2 precipitation formal operation
1, precipitation should run and cooperate with each other, excavation of dewatering well construction excavation and a half months in advance, dewatering well should be after the engineering pile, grouting construction, drainage in dewatering well construction phase should be side edge, namely after completing a few Wells should be take in precipitation and shall ensure that the excavation has about half a month of pumping time, to achieve good results in foundation pit drainage.
2, after the water level to the bottom, can close pump, after waiting for borehole water level rise should be open water pumps.
3, pumping clearance from short to long, each well drained after should stop pump, in order to prevent motor burn out. Rising water levels should immediately after the open pump for water yield larger pumping Wells every day to open pump frequency should be increased.
4, in the stage of excavation of foundation pit of rain water total package units shall promptly send some
您可能关注的文档
最近下载
- 《旅行社经营与管理》课件 第一章 旅行社概述.ppt VIP
- 人教版八年级数学上册分式的加减法练习题精选47.doc VIP
- 最新【人教版】三年级数学上册教科书电子版教学课本(2025年秋-新教材版本).docx
- 【精选】申银万国行业分类标准(2014版).pdf VIP
- 3500个常用汉字整理完整.doc VIP
- 农村狗狗交配的全过程,让你看了有点不可置信.pdf VIP
- 2023——2024学年度第一学期北师大版小学数学一年级上册教学计划附教学进度表.docx VIP
- 新北师大版四年级数学上册第四单元《买文具》课件14.ppt VIP
- 8.2 掌握自驾游计调业务 课件《旅行社计调业务》(中国言实出版社).pptx VIP
- 申银万国行业分类.pdf VIP
文档评论(0)