- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
backfill immediately. Meantime if a pipe deformation is bigger, endanger the pipeline safety, take line bottom grouting treatment, (at the edge of the line below the 5 meters to 45 ° to drilling pipe grouting, at the same time please monitoring unit observation pipe deformation situation at any time, until the line is stable.
B. 2 facility protection measures on the ground
The ground facilities, such as the high tension line, walls, etc., according to the actual situation and the related units to contact, to take protective measures, to ensure the smooth progress of construction. Projects under construction (including the scaffolding) of the lateral edge and the edge of an electric overhead line, as well as the transformer into the line between, must keep a safe distance. Can not meet the specified minimum distance, protective measures must be taken. When the erection or dismantling protective measures, must be a power outage, by a qualified scaffolder build-up, electrical technicians or full-time technical staff responsible for monitoring. The transformer with a wooden foot hand made barrier and federated eye network, marked with electric shock, dangerous, no climbing and other words.
Before on the surrounding buildings make actual survey, excavation of the original building height are identified, with level control during excavation observation buildings there are any changes, if there are any changes in time for party a, supervision, design units consultations and take corresponding measures.
C construction technical scheme and measures
C. 1 alignment measurement
1, according to the construction unit to provide urban plane control network and city level node location, number, precision grade and its coordinates and elevation data and to determine the heating pipe network line and elevation.
2, heat supply pipeline engineering construction alignment measurement should meet the following requirements:
1) should be according to the order of the trunk, trun
您可能关注的文档
- ABAQU如何画XY曲线图.doc
- ABAQU初学者使用算例.doc
- abaqu安装方法详解.doc
- Abaqu接触分析中出现收敛困难时的常用检查方法.doc
- abaqu安装方法.doc
- Acces实验指导.doc
- acces实验指导书.doc
- ACS原理使用说明.doc
- AD-M0上面层试验段总结(评审汇报材料7.10).doc
- AGR给水技术交底.doc
- 2025年共享民宿项目人力资源配置与可行性研究评估.docx
- 2025年职业教育产教融合项目资金申请项目申报政策解读报告.docx
- 2025年新型储能电池管理系统在电网储能调频中的能源储存能力增强报告.docx
- 2025年天然气水合物(可燃冰)开采技术国际合作案例分析报告[001].docx
- 家具制造业个性化定制生产模式产业链协同创新产业链发展策略报告.docx
- 2025-2026学年初中信息技术(信息科技)第4册泰山版(2018)教学设计合集.docx
- 2025年康复医疗行业市场细分领域发展策略创新白皮书.docx
- 电商行业2025年用户留存与数据分析策略.docx
- 艺术教育行业2025年在线培训平台市场分析与竞争格局预测报告.docx
- 2025年高端母婴市场产品创新与品牌竞争力提升研究报告.docx
最近下载
- 肯尼亚建筑市场行业报告.pptx
- 浙江杭州余杭交通集团有限公司招聘笔试题库2023.pdf VIP
- 人工胆囊、人工胆囊设备和人工胆囊在胆囊手术中的应用.pdf VIP
- 重力与弹力高一上学期物理人教版2019必修第一册+.pptx VIP
- 胃癌的诊治现状与进展.pptx VIP
- 数控压装压力机 第2部分:技术条件.docx VIP
- 【课件】匀变速直线运动速度与时间的关系+课件-高一上学期物理人教版(2019)必修第一册.pptx VIP
- XX医院职能部门监管手术、麻醉授权管理督导、检查、总结、反馈及持续改进记录表.pdf VIP
- 电力调度数据网络接入技术规范及网络拓扑图.doc VIP
- ZZGA高频开关整流器使用说明书.doc
文档评论(0)