- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
SECTION 23 25 00HVAC WATER TREATMENT
SPEC WRITER NOTE:
1. Delete between //// if not applicable to project. Also delete any other item or paragraph not applicable in the section and renumber the paragraphs.
2. References to pressure in this section are gage pressure unless otherwise noted.
PART 1 GENERAL
1.1 DESCRIPTION
A. This section specifies cleaning and treatment of circulating HVAC water systems, including the following.
1. Cleaning compounds.
2. Chemical treatment for closed loop heat transfer systems.
3. Chemical treatment for open loop systems.
4. Glycolwater heat transfer systems.
1.2 RELATED WORK
A. Test requirements and instructions on use of equipment/system: Section 01 00 00, GENERAL REQUIREMENTS.
B. General mechanical requirements and items, which are common to more than one section of Division 23: Section 23 05 11, COMMON WORK RESULTS FOR HVAC and STEAM GENERATION.
C. Piping and valves: Section 23 21 13, HYDRONIC PIPING and Section 23?22?13, STEAM and CONDENSATE HEATING PIPING.
D. //Cooling Towers//Fluid Coolers//: Section 23 65 00, COOLING TOWERS.
DESIGNER NOTE: The designer shall consult with local water treatment specialists to determine the appropriate water treatment strategy for the HVAC systems included in the project.
1.3 QUALITY ASSURANCE
A. Refer to paragraph, QUALITY ASSURANCE in Section 23 05 11, COMMON WORK RESULTS FOR HVAC and STEAM GENERATION.
SPEC WRITER NOTE: Evaluate the extent of technical services on a case by case basis.
B. Technical Services: Provide the services of an experienced water treatment chemical engineer or technical representative to direct flushing, cleaning, pre-treatment, training, debugging, and acceptance testing operations; direct and perform chemical limit control during construction period and monitor systems for a period of 12 months after acceptance, including not less than 6 service calls and written status reports. Emergency calls are not included. //During this period perform
您可能关注的文档
- Micro Fous白盒测试解决方案.doc
- Microsof Word练习 文档.docx
- Moodle课程备份和恢复.doc
- MPAcc专业适什么样的人.doc
- MOT三线制说明(最终用户).doc
- MPAcc考研考科目介绍.doc
- MTP - 中层管技能训(周新奇)中华讲师网.doc
- M岳阳油污清洗剂【长沙兆冠环保公司】长沙油污油垢清洗剂%株洲油污清洗剂%湖南油污清洗剂%湘潭油污清洗剂.doc
- new《供配电技》实训室建设.doc
- NFX MarKts 品汇国际- 存款准备金.doc
- 2025年烟台市正大城市建设发展有限公司招聘工作人员12名笔试参考题库附带答案详解.doc
- 2025年衢州市属国企公开招聘工作人员笔试参考题库附带答案详解.doc
- 2025中铁四局集团有限公司法律合规部公开招聘1人笔试参考题库附带答案详解.docx
- 2025中国建筑股份有限公司岗位招聘【人力资源部(干部人事部)】笔试参考题库附带答案详解.docx
- 2025年滁州定远县中盐东兴盐化股份有限公司招聘2人笔试参考题库附带答案详解.doc
- DB1331T109-2025雄安新区建设工程抗震设防标准(963.84KB)(1).pdf
- 2025辽宁省能源控股集团所属抚矿集团招聘76人笔试参考题库附带答案详解.pdf
- 2024陕西延长石油集团华特新材料股份有限公司社会招聘8人笔试参考题库附带答案详解.pdf
- 2023内蒙古大唐国际锡林浩特矿业有限公司采煤自营专项社会招聘32人笔试参考题库附带答案详解.pdf
- 2024年12月云南大学国际合作与交流处公开招聘(1人)笔试历年典型考题(历年真题考点)解题思路附带答案详解.doc
最近下载
- 注册安全工程师中级其他安全生产专业实务(其他安全类案例)模拟试卷5.pdf VIP
- 2025低压分布式光伏入网技术规范.docx VIP
- GB生产设备安全卫生设计总则.doc VIP
- 产教融合、校企合作——黄淮学院的探索与实践.ppt VIP
- 注册安全工程师中级其他安全生产专业实务(其他安全类案例)模拟试卷9.pdf VIP
- 《呼吸防护用品 自吸过滤式防颗粒物呼吸器》GB 2626-2019-2020.7.1.docx VIP
- 危险货物包装标志.docx VIP
- 地下水质量标准GB148482017.docx VIP
- 《心理学史教学大纲.doc VIP
- GBT-用于校准表面污染监测仪的参考源 α、β和光子发射体及编制说明.pdf VIP
文档评论(0)