PR-1047, Well Integrity Maintenance Procedure .DOC

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Petroleum Development Oman L.L.C. RESTRICTED Document ID: PR-1047 May 2007 Filing Key: Business Control Well Engineering Well Integrity Maintenance Procedure User Note: The requirements of this document are mandatory. Non-compliance shall only be authorised by the Document Authority or his Delegate through STEP-OUT approval. A controlled copy of the current version of this document is on PDOs EDMS. Before making reference to this document, it is the users responsibility to ensure that any hard copy, or electronic copy, is current. For assistance, contact the Document Custodian. Users are encouraged to participate in the ongoing improvement of this document by providing constructive feedback. Please familiarise yourself with the Document Security Classification Definitions They also apply to this Document! Keywords: WIT, Wellhead Integrity Test, SIT, Subsurface Integrity Test, Well Failure Model, Well type, gas lift wells, steam injection wells, free flowing wells This document is the property of Petroleum Development Oman, LLC. Neither the whole nor any part of this document may be disclosed to others or reproduced, stored in a retrieval system, or transmitted in any form by any means (electronic, mechanical, reprographic recording or otherwise) without prior written consent of the owner. This document can be accessed via the following link: http://sww3.pdo.shell.om/getdoc?dataid=95049 (PDO Intranet) This page was intentionally left blank Document Authorisation Authorised For Issue: May 2007 Revision History The following is a brief summary of the 4 most recent revisions to this document. Details of all revisions prior to these are held on file by the issuing department. Note that changes made as part of Document Maintenance (correction of broken hyperlinks) will not be recorded in this Revision Table. Revision No. Date Author/ Editor Changes/ Remarks 2 April 2007 Obaid Al Farsi (UWXZ/4) Christian Koepchen (UWH/2), Robin Gardiner (UPT/2) Alignment of Well

文档评论(0)

cjbckk + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档