- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
measuringlevelingruleratbothendsmeasuringlevelingruleratbothends
measuring leveling ruler at both ends;
(12) plates to allow the difference of diagonal deviation of 10 mm, inspection method for steel rule of two diagonal lines;
(13) wallboard diagonal difference is 5 mm, the allowable deviation inspection method for steel rule of two diagonal lines;
(14) to allow the reserved hole centerline deviation is 5 mm, test method for the feet;
Reserve only electives (15) to allow the size deviation of plus or minus 5 mm, test method for the feet;
(16) to allow the reserved hole centerline deviation to 10 mm, test method for the feet;
(17) to allow the reserved hole hole size deviation of plus or minus 10 mm, test method for the feet;
(18) embedded parts embedded plates to allow the centerline position deviation is 5 mm, test method for the feet;
(19) embedded parts and concrete surface plane the allowable deviation of the elevation difference is + 5 mm, test method for the feet;
(20) embedded bolt, embedded sleeve position at the centre of the allowable deviation of 2 mm, test method for the feet;
(21) embedded bolts exposed length of allowable deviation of + 10, 3-5 mm, test method for inspection.
5, the embedded parts on the prefabricated, steel reserve, buries the line and the reserved hole specification, location and quantity should meet the design requirements.
6, the combination of prefabricated surface should comply with the design requirements.
Installation and connection of [3]
1, the prefabricated connection between structure should meet the design requirements.
2, bear the joint and flat-fell seam of internal force, when the concrete strength did not meet the design requirements, shall not be lifting a layer structures. Have installed fabricated structure, should be after the concrete strength to meet the design requirements, can withstand all the design load.
3, prefabricated structure after the installation, size deviation shall meet the following requirements.
Based component (1) the centerline to allow the
您可能关注的文档
- LCD5110中文资料.doc
- LCD与CRT的区别.doc
- LCD1602高手使用详解.doc
- lcd中文资料.doc
- LCD、OLED及等离子电视面板技术对比.doc
- LCDHome论坛_修改《风寒专用国芯通用BIN修改器》的教程!.doc
- LCD电子广告屏.doc
- LDC视频监控系统技术方案.doc
- LCD生产流程.doc
- JAVA实现图书管理系统毕业论文设计.doc
- 【上交所-2025研报】浙江建业化工股份有限公司2025年半年度报告.pdf
- 【上交所-2025研报】振江股份2025年半年度报告.pdf
- 【上交所-2025研报】一拖股份2025年半年度报告.pdf
- 【上交所-2025研报】中通国脉通信股份有限公司2025年半年度报告.pdf
- 【上交所-2025研报】上海荣泰健康科技股份有限公司2025年半年度报告.pdf
- 养殖知识培训通知课件.pptx
- 养牛保健知识培训总结课件.pptx
- 陶瓷3D打印增韧技术2025年在精密模具制造中的应用.docx
- 芯片级封装技术在智能交通系统中的创新应用报告.docx
- 【上交所-2025研报】上汽集团2025年半年度报告.pdf
最近下载
- 20140902--Epi-info-软件创建统计地图.pptx VIP
- 湖南文艺出版社高中音乐选修音乐鉴赏晚上的拉格.ppt VIP
- 辣椒滴灌工程设计方案模板(3篇).docx
- CCP验证记录.doc VIP
- 2024-2025(最新)人教版语文一年级上册第三单元教案汉语拼音(2024部编新教材).docx VIP
- 高教社马工程人力资源管理教学课件unit9.pptx VIP
- CJJT 202-2013 城市轨道交通结构安全保护技术规范.docx VIP
- 项目-竣工财务决算报表.doc VIP
- 2023年土地估价师考试真题卷(含答案)M1D15.docx VIP
- 2024教科版科学三年级上册 全册教学课件.pdf
文档评论(0)