第5章+悬索结构讲述.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
第5章悬索结构讲述

Suspended-cable Structure The allowable space deviation between the prestressed holes on the supporting members located on both the ends of the cable is L / 3000 (L refers to span), and is no more than 20 mm 钢索两端支承构件预应力孔的间距允许偏差为 L/3000 (L 为跨距),并不大 于20mm; Load-bearing cable should be arranged first and then the stable cable. The arrangement should be adjusted according to the design of the initial state of geometric surface and prestressed value adjustment, and the deviation should be controlled within 10%; 穿索时应先穿承重索,后穿稳定索,并根据设计的初始几何状态曲面和预应 力值进行调整,其偏差宜控制在 10%以内; Roof components must be symmetrically installed. 各种屋面构件必须对称地进行安装。 5.5.2 The installation of cable 钢索的安装 Suspended-cable Structure 5.5.3 The tension of cable 钢索的张拉 The jack should be calibrated before tensioning 千斤顶在张拉前应进行标定 The cable should be tensioned symmetrically and in stages according to the design of the prestressed value. 对索施加预应力时,应按设计提供的预应力值分阶段对称张拉。 The commonly used tensioning methods in suspended-cable structure are: jack tension method, screw thread tension method, transverse tension method and electrothermal tension method. 悬索结构中较为常用的预张力施加方法有:千斤顶张拉法、丝扣旋张 法、横向张拉法和电热张拉法等。 Suspended-cable Structure 5.5.4 The corrosion prevention of cable 钢索防腐 Following corrosion prevention methods can be adopted according to service environment and specific construction conditions: 钢索的防腐应根据使用环境和具体施工条件选用以下方法: Fabric wrapped with butter 黄油裹布。 Mutilayer plastic coating 多层塑料涂层,该涂层材料浸以玻璃加筋的丙烯树脂; Mutilayer liquid chloroprene rubber with oil paint on surface 多层液体氯丁橡胶,并在表层覆以油漆; Fill liquid neoprene in the plastic tube 塑料套管内灌液体的氯丁橡胶; Use galvanized steel wire strand采用镀锌钢丝钢绞线。 Suspended-cable Structure 5.5.5 Engineering cases 工程实例 Install the steel inner ring 安装钢内环 Install the wire 安装钢索 Established initial stress in lower cables 建立下索初应力 Place the inner ring 内环就位 Tension 施加预应力 Laying roofing铺设屋面 Beijing Workers Gymnasium 北京工人体育馆 indoor setting 内景 outdoor scene 外景

文档评论(0)

441113422 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档