- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
AftercableinstallationAftercableinstallation
After cable installation, should check whether there is any damage on optical fiber, and the loss of fiber optic cable laying of parking; Make sure no damage, and then succeeded. After the cable laying, appropriate measurement channel total loss, and fibre channel to the waveguide optical time-domain reflectometer observation attenuation characteristic curve.
For example, conference television system network related to the transmission distance. With coaxial cable network in within 300 meters, 300 meters with the optical fiber transmission.
1 h414043 building intelligence engineering commissioning test requirements
After the completion of the building intelligence engineering construction, must carry on the system commissioning test, ensure system can enter the normal operation. The main topic is: this article building intelligence engineering test implementation; Detection of building equipment automatic monitoring system; Safety engineering commissioning test requirements.
A, inspection of the implementation of the intelligent building system
1. By construction unit (or engineering contractor) to the inspection agency application system, at the time of going through the formalities for detection of entrust, as-built documents shall be submitted to examination organization system technical documents (including equipment), system test report, project contract technical files, system design, etc.
2. The equipment used in building intelligence engineering, materials, interface and software of the project such as functionality, performance, testing should be according to national standards and design requirements and provisions of the contract.
3. The intelligence engineering test should be according to the contract of engineering technical document and construction drawing design, design change description, regarding the record, product technical documents.
4. The testing scheme should be in line with the engineering construction quality acceptance of norms, a