How to calculate excavators productivity.doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
HowtocalculateexcavatorsproductivityHowtocalculateexcavatorsproductivity

How to calculate excavators productivity Productivity is one of the main technical and economic indexes of hydraulic excavator, it said in a unit of time from the face in mining and unloading soil transport vehicles or spoil bank earthwork volume. How many cubic meters per hour usually dug as a unit, on the site is also useful to dig out day and night shift or earthwork volume to represent. The general concept of three kinds of productivity. The 1 theory of productivity The theory of productivity refers to an excavator working hours in condition the productivity. Condition may be taken as: (1) a skilled driver operation, fully consider the machinery for single action combined oil and possibilities for composite action, such as moving arm birth and turntable at the same time, the boom and the bucket rod hydraulic cylinder working alone can be combined oil etc.. (2) select the most frequent working conditions and the average size of work. As taking the most frequently excavated soil as the calculation of soil. The backhoe, half maximum digging depth is calculated as mining depth, the average height of the loading height or spoil bank as calculated by dumping height, take 90 ° as one-way rotary turntable angle. (3) face, transport vehicle (spoil bank) and the relative position between the appropriate selection of excavators, truck, with a good. Theory of productivity calculated: Q = 60qn (m3 / h) Type: Q as the theory of productivity; N per minute work cycle theory value; Q bucket geometrical capacity (cubic meters) Productivity refers to the maximum productivity machinery in the conditions for work an hour can get. The given conditions including soil conditions, the bucket fill, loading conditions. The actual productivity is mechanical practice over a period of time the average productivity. To calculate the actual productivity mainly consider two factors, namely, the utilization rate of the machine and the driver proficiency, actual productivi

文档评论(0)

cxiongxchunj + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档