surface treatment of base.doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
surfacetreatmentofbasesurfacetreatmentofbase

surface treatment of base - cold brush priming oil - play line - additional layer paste to the first coil the shop is stuck, joint repair of the place such as inspection, hidden to the name of the second coil the shop is stuck, hidden - fine stone concrete protective layer construction Side walls: the basic level processing - cold brush priming oil - line - Yin and Yang Angle, nozzle additional layer to spread stick the first layer from the bottom to coil, acceptance of the first layer of waterproof to spread from the bottom to stick the second coil, sealing side to check and accept 6.2.1.7.3.3 waterproof coiled material surface at the grass-roots level 1, before the construction work carefully cleaning the dust on the surface of the grassroots, groceries, etc., to ensure the primary surface is clean, working around the bare soil surface cover, with federated eye network, to prevent the dust and debris around the construction will be blown into the work area; 2, at the grass-roots level surface to a solid, smooth, not loose, the drum, the surface projection or serious rough phenomenon. Flatness allowed deviation is + / - 3 mm, per meter range of no more than one place. If roughness is bad or the sand, picking chisel process can meet the permissible deviation before construction; 3, waterproof coiled material in the Yin and Yang Angle before construction, basic Angle of Yin and Yang of the application of 1:3 cement mortar to make the circular arc of the 100 mm or 50 x 50 obtuse or with Yin Angle with cement mortar into eight; 4, concrete base surface drying, moisture content should not be greater than 9%. Method is used to measure the moisture content, surface at the grassroots level to put a piece of linoleum or glass 50 x 50 cm, after 3 to 5 h, ever drops below, if there is no water construction. Need to make sure that the primary surface drying, completes the rainproof measures. 6.2.1.7.3.4 construction points 1, the preparation work: during the period of

文档评论(0)

cxiongxchunj + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档