surface treatment of base.docVIP

  • 3
  • 0
  • 约 7页
  • 2017-01-05 发布于贵州
  • 举报
surfacetreatmentofbasesurfacetreatmentofbase

surface treatment of base - cold brush priming oil - play line - additional layer paste to the first coil the shop is stuck, joint repair of the place such as inspection, hidden to the name of the second coil the shop is stuck, hidden - fine stone concrete protective layer construction Side walls: the basic level processing - cold brush priming oil - line - Yin and Yang Angle, nozzle additional layer to spread stick the first layer from the bottom to coil, acceptance of the first layer of waterproof to spread from the bottom to stick the second coil, sealing side to check and accept 6.2.1.7.3.3 waterproof coiled material surface at the grass-roots level 1, before the construction work carefully cleaning the dust on the surface of the grassroots, groceries, etc., to ensure the primary surface is clean, working around the bare soil surface cover, with federated eye network, to prevent the dust and debris around the construction will be blown into the work area; 2, at the grass-roots level surface to a solid, smooth, not loose, the drum, the surface projection or serious rough phenomenon. Flatness allowed deviation is + / - 3 mm, per meter range of no more than one place. If roughness is bad or the sand, picking chisel process can meet the permissible deviation before construction; 3, waterproof coiled material in the Yin and Yang Angle before construction, basic Angle of Yin and Yang of the application of 1:3 cement mortar to make the circular arc of the 100 mm or 50 x 50 obtuse or with Yin Angle with cement mortar into eight; 4, concrete base surface drying, moisture content should not be greater than 9%. Method is used to measure the moisture content, surface at the grassroots level to put a piece of linoleum or glass 50 x 50 cm, after 3 to 5 h, ever drops below, if there is no water construction. Need to make sure that the primary surface drying, completes the rainproof measures. 6.2.1.7.3.4 construction points 1, the preparation work: during the period of

文档评论(0)

1亿VIP精品文档

相关文档