surfacetreatmentofbasesurfacetreatmentofbase
surface treatment of base - cold brush priming oil - play line - additional layer paste to the first coil the shop is stuck, joint repair of the place such as inspection, hidden to the name of the second coil the shop is stuck, hidden - fine stone concrete protective layer construction
Side walls: the basic level processing - cold brush priming oil - line - Yin and Yang Angle, nozzle additional layer to spread stick the first layer from the bottom to coil, acceptance of the first layer of waterproof to spread from the bottom to stick the second coil, sealing side to check and accept
6.2.1.7.3.3 waterproof coiled material surface at the grass-roots level
1, before the construction work carefully cleaning the dust on the surface of the grassroots, groceries, etc., to ensure the primary surface is clean, working around the bare soil surface cover, with federated eye network, to prevent the dust and debris around the construction will be blown into the work area;
2, at the grass-roots level surface to a solid, smooth, not loose, the drum, the surface projection or serious rough phenomenon. Flatness allowed deviation is + / - 3 mm, per meter range of no more than one place. If roughness is bad or the sand, picking chisel process can meet the permissible deviation before construction;
3, waterproof coiled material in the Yin and Yang Angle before construction, basic Angle of Yin and Yang of the application of 1:3 cement mortar to make the circular arc of the 100 mm or 50 x 50 obtuse or with Yin Angle with cement mortar into eight;
4, concrete base surface drying, moisture content should not be greater than 9%. Method is used to measure the moisture content, surface at the grassroots level to put a piece of linoleum or glass 50 x 50 cm, after 3 to 5 h, ever drops below, if there is no water construction. Need to make sure that the primary surface drying, completes the rainproof measures.
6.2.1.7.3.4 construction points
1, the preparation work: during the period of
您可能关注的文档
- Solar Access Analysis.doc
- Solaris10系统安装.doc
- Solution_ARENS_Auditing13eAEB_SM_CH23_1.doc
- Some sleep drugs do more than make you sleep.doc
- SONAX 产品施工技术培训手册.doc
- Sociolinguistic Analysis of Public Service Advert.doc
- SOTALOL索他洛尔 台湾,用药,说明。.doc
- SOP 03-101-01 培训管理规程.doc
- SonicWALL 防火墙配置NAT Policy.docx
- SP G7M6 Around town.doc
最近下载
- 科技英语写作讲义.pdf VIP
- 《苹果手机删除的照片如何恢复?苹果最近删除照片恢复.docx VIP
- 水平井完井工艺技术要求,SY_T6-2016.pdf VIP
- SY/T 6270-2017 石油天然气钻采设备固井、压裂管汇的使用与维护.pdf VIP
- 部编版一年级语文下册第六单元测试卷.docx VIP
- 德州职业技术学院单招职业技能测试参考试题库(含答案).docx VIP
- SolidWorks-全套入门教程PPT课件.pptx VIP
- 2025年加州驾照常考题库及答案.doc VIP
- SYT5695-2017 钻井液用降黏剂 两性离子聚合物.pdf VIP
- 高中数学第二章随机变量及其分布章末复习课件新人教A版选修.pptx VIP
原创力文档

文档评论(0)