- 117
- 0
- 约4.36万字
- 约 37页
- 2017-01-04 发布于浙江
- 举报
《建筑工程英语》课后习题答案
Unit One Concept of Building and Construction Engineering
Part One, Section A
Key to the listening:
contract;
have this project;
copy to the architect
completion;
section;
6) take over;
7) Quality control;
8) you will get the work you are paying for while we get paid for the work we perform.
2、Lucas writes a report according to the conversation above.
This morning, the client told me that our company was awarded the contract of the project. He issued the letter of acceptance to me and requested several documents to be provided to them before we should commenc
您可能关注的文档
最近下载
- 医学影像诊断学第3版病例讨论 第七章 泌尿系统病例讨论.pdf VIP
- 湖北省三峡电力职业学院2025年单独招生考试水利水电建筑工程技术专业职业技能测试大纲.docx VIP
- 飞龙通用航空公司秋招试题及答案.doc VIP
- 湖北理工学院C语言考试真题.pdf VIP
- 2020年整理男性公民兵役登记表.doc.docx VIP
- 新庄湾联合站工艺设(说明书、计算书).doc VIP
- 《水产养殖场智慧化建设通用规范》.pdf VIP
- GB_T_15945-2008电能质量 电力系统频率偏差.docx VIP
- 《继电保护与二次回路》..doc VIP
- 供应商信息安全管理体系自检表V02-00.xlsx VIP
原创力文档

文档评论(0)