网站大量收购闲置独家精品文档,联系QQ:2885784924

the typethe type.doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
the type; Evaluation of value; ^; Evaluation factors; A; Satisfaction (%); B; Weight (%). By the above formula to calculate the maximum value of s is the choice of scheme. 3. The main construction method of economic analysis: large, heavy, high precision, high value of transportation of the equipment, or suspended Loading plan; Large, thick, large amount of welding and important parts or have special requirements of welding construction plan; Large quantities, pay more Fork of the project construction organization plan; Special assignment scheme; Site prefabrication and factories; Test and integrated system Nondestructive testing; Traditional technology and adopting new technology, new process; The key process technology solutions, etc. 4. The construction scheme of the technical and economic comparison (1) technical sophistication 1) compare the technology level of each scheme, such as the national, provincial level, industry, etc. 2) is the technology innovation of these schemes, such as breakthrough, fill the gap, to lead. 3) comparing the scheme of technical efficiency, such as lifting technology of lifting tonnage, each time interval, lifting the diameter of the fan Wai, lifting height, etc.; Can adapt to the parent metal welding technology, welding speed, the deposition efficiency, adapt to welding position And so on; Nondestructive testing technology of single chip, chip X-ray detector, etc.; Measurement technology in the plane, space, automatic recording, and painting Figure, etc. 4) comparing the scheme innovation points, such as the point of this scheme is the ratio of the total technical points. 3121 h420000 mechanical and electrical engineering project construction management Scheme (5) to compare the safety, such as reliability, accident rate, etc. (2) the economic rationality is: to compare the one-time investment of the program. Comparing the schemes of the time value of money. Comparing the solution of the environmental impact

您可能关注的文档

文档评论(0)

cduutang + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档