变高度顶推连续梁整体受力性能研究.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
变高度顶推连续梁整体受力性能研究 摘要 顶推施工已广泛应用于连续梁,但大部分研究主要集中于等高度顶推施工工艺,而对变高度顶推施工整体受力情况分析很少。本文将以崇启大桥为工程背景,研究变高度连续钢箱梁顶推整体受力性能。首先,使用CAD画出各梁段横截面图,求出各段梁的面积、惯性矩、密度等基本参数。然后,编写顶推工况表;接着,使用ANSYS软件,通过编写命令流建立连续梁桥顶推施工全过程的整体模型,求出各工况下主梁应力、导梁应力和支座反力。进一步,根据计算结果,对内力进行分析,得到主梁各节点的内力变化规律。最后,再分别改变导梁的面积、密度和横截面几何形状,研究改变后主梁应力的变化,得到相应的结论。通过本文研究有望推动顶推施工的发展,加快顶推施工在变高度梁的应用。 关键词:顶推施工;变高度;连续箱梁;内力分析 TNTEGRAL STRESS OERFORMANCE RESEARCH OF VARIABLE HEIGHT DURING INCREMENTAL LAUNCHING ABSTRACT Jacking construction has been widely used continuous girder, but most of the research focuses on such highly pusher construction technology, and the variable height rarely jacking construction overall stress distribution analysis. Will take chung kai bridge as the engineering background, this paper studies become highly pushing overall mechanical performance of the continuous steel box girder. First, use CAD draw a picture of each cross section beams, and the area, moment of inertia of the paragraphs beam, the basic parameters such as density. Then, write the pusher working table; Then, using ANSYS software, by writing command flow to establish continuous girder bridge jacking construction whole process of the overall model, under various operating conditions and the main girder stress, guide Liang Yingli and counteracting force. Further, according to the results of calculation and analysis of internal force and main girder internal force variation law of each node. Finally, to change the area of the nose, density and cross section geometry, the change after the change of the main girder stress, the corresponding conclusion. Through this article research is expected to promote the development of the jacking construction, speed up the jacking construction in the application of variable height beam. Key words: Pushing Construction; variable height; continuous box girder; internal force analysis 目录 1 绪论 1 1.1 顶推施工 1 1.1.1 顶推施工发展历史 1 1.1.2 顶推施工特点 3 1.2 顶推施工全内力分析 3 1.2.1利用经典解析方法对导主梁模型受力分析 3 1.2.2有限元计算内力 4 1.3变高度连

文档评论(0)

4477704 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档