- 1、本文档共44页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
首基样板评策划
目 次
1 策划概述············································································1
1.1 编制目的·····································································1
1.2 编制依据·····································································1
1.3 工程建设的意义(简述)························································2
1.4 工程建设主要特点·····························································3
1.5 工程参建单位·································································4
2 工程创优目标·······································································4
2.1 质量控制目标·································································4
2.2 安全控制目标·································································4
2.3 文明施工和环境保护控制目标···················································5
2.4 工期控制目标·································································5
2.5 造价控制目标·································································6
2.6 工程档案管理目标·····························································6
3 监理资源配置及创优组织·····························································6
3.1 监理资源配置·································································6
3.2 监理创优组织································································12
4 监理创优措施······································································24
4.1 综合管理措施································································24
4.2 质量控制措施································································26
4.3 安全文明施工与环境保护控制措施··············································33
4.4 进度控制措施································································39
4.5 造价控制措施································································40
4.6 工程档案管理创优措施························································40
1.策划概 述
1.1 策划目的
为了实现本工程建设管理单位徐州供电公司“创优规划”中提出的“工程零缺陷移交、确保达标投产、确保国家电网公司优质工程,争创国家级优质工程”的创优目标及争取2011年10月31日投运的工程管理目标,减少返工和材料、人工浪费,特制定本策划。
1.2 策划依据
(1)国家及行业有关法律法规。
(2)建设管理单位编制的《工程建设管理纲要》。
(3)
您可能关注的文档
- 预验收会议要.doc
- 预防职务犯法律知识.ppt
- 预应力简支形梁桥.doc
- 预防高空坠施工方案.doc
- 预防医学,内污染 11五临一.ppt
- 领先教育项总表.doc
- 领秀城一期工图设计任务书.doc
- 预验收报告本.doc
- 领导与科学术.doc
- 颍青路竣工收资料.doc
- 白天晚上教学课件.ppt
- 2025年山东菏泽市牡丹区中医医院引进急需紧缺专业技术人才30人笔试模拟试题参考答案详解.docx
- 2025年山东菏泽市牡丹区中医医院引进急需紧缺专业技术人才30人笔试模拟试题带答案详解.docx
- 2025年山东菏泽市牡丹区中医医院引进急需紧缺专业技术人才30人笔试模拟试题及参考答案详解.docx
- 2025年山东菏泽市牡丹区中医医院引进急需紧缺专业技术人才30人笔试模拟试题及参考答案详解一套.docx
- 2025年山东菏泽市牡丹区中医医院引进急需紧缺专业技术人才30人笔试模拟试题及完整答案详解1套.docx
- 2025年山东菏泽市牡丹区中医医院引进急需紧缺专业技术人才30人笔试模拟试题及参考答案详解1套.docx
- 2025年山东菏泽市事业单位招聘急需紧缺岗位目录(第一批)笔试模拟试题参考答案详解.docx
- 2025年山东菏泽市牡丹区中医医院引进急需紧缺专业技术人才30人笔试模拟试题及答案详解1套.docx
- 画西瓜教学课件.ppt
文档评论(0)