- 1、本文档共89页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Chapter 3 Network Planning 3.1 Why Network Planning? First, Find the right balance between inventory, transportation and manufacturing costs (Network design) 3.1 Why Network Planning? Second, Match supply and demand under uncertainty by positioning and managing inventory effectively (Inventory position) 3.1 Why Network Planning? Utilize resources effectively by sourcing products from the most appropriate manufacturing facility (Resource allocation by Supply chain master schedule) Also see Bis case on page 73 Three Hierarchical Steps Network design Number, locations and size of manufacturing plants and warehouses Inventory positioning: Related to the inventory management strategies Resource allocation: Determine whether production and packaging of different products is done at the right facility How much capacity each plant should have to meet seasonal demand? 3.2 Network Design Overview Physical configuration and infrastructure of the supply chain. A strategic decision with long-lasting effects on the firm. (not easy to change) Decisions relating to plant and warehouse location as well as distribution and sourcing Key Strategic Decisions Determining the appropriate number of facilities such as plants and warehouses. Determining the location of each facility. Determining the size of each facility. Allocating space for products in each facility. Determining sourcing requirements(Inbound logistics). Determining distribution strategies, i.e., the allocation of customers to warehouse (Outbound Logistics) Objective and Trade-Offs Objective: Design or reconfigure the logistics network in order to minimize annual system-wide cost subject to a variety of service level requirements Increasing the number of warehouses typically yields: An improvement in service level due to the reduction in average travel time to the customers An increase in inventory costs due to increased safety stocks. An increase in overhead and setup costs A reduction in outbound transportation
文档评论(0)