- AGREEMENT OF BOT PROJECT.docVIP

  1. 1、本文档共33页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
AGREEMENT OF BOT PROJECT   This Agreement is made and entered into by and between the government of_____________(hereinafter called #39;B#39;) represented by________(hereinafter called #39;A#39;) and __________Corporation, a company duly organized and existing under the laws of the People#39;s Republic of China with its principal office at___________(hereinafter called #39;C#39;).   Whereas, A and C concluded the Memorandum Concerning __________Project on the ____________and C had been given Exclusive Right from B to carry out investigation and implement ____________Project (hereinafter called #39;the Project#39;) by way of joint financing between C and B (so called BOT).   Whereas, the loan agreement, guarantee agreement, letter of guarantee, etc. shall constitute integral components of this Agreement. The Project#39;s installed capacity is __________.   Now therefore, the parties hereby agree as follows:   1. Definition and Interpretation   #39;Project#39; means the planning, feasibility study, design and engineering, construction, equipping, completion, testing, commissioning and operation of the infrastructure project.   #39;Project Cost#39; means the cost specified in Clause 3.   #39;Operation Period#39; means the period specified in Clause 10.1 from the starting date of commercial operation of the infrastructure project.   #39;Completion Date#39; means the day upon which C certifies that the infrastructure project has successfully completed its testing and can start Operation Period.   #39;Force Majeure#39; shall have the meaning specified in Clause 16.   #39;Project Scope#39; means the scope of supply and services of C in connection with the execution of the Project as described in Annex 2.   #39;Site#39; means the site for the infrastructure project including ___________, special roads, and other areas for construction as specified in   

文档评论(0)

mcplj198370002 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档