- 3
- 0
- 约9.05千字
- 约 6页
- 2017-01-18 发布于湖南
- 举报
15150; meteringand instrumentation[ standards](15150;meteringand仪表(标准))
PART 1 – GENERAL
RELATED SECTIONS:
Refer to Section 15950 for requirements related to steam metering and chilled water metering.
SCOPE OF SECTION:
This section contains the requirements relating to metering and instrumentation.
PART 2 - METERING
GENERAL:
University Policy: It is the policy of the University that all utilities shall be metered. Utilities include electricity, potable (domestic) water, chilled water, steam, gas, and irrigation (when irrigation is connected to potable water). All new buildings and renovations shall include installation of permanent metering o
您可能关注的文档
- 105_09 fouldrainageassessmentform( f d a1)(105年_09 fouldrainageassessmentform(f d a1)).doc
- 116. o-level material control officer- a m d o(116年。控制官- m d o o级材料).doc
- 251x981121198- west chester university(251年x981121198 -西切斯特大学).doc
- 312. w d.tex10.met- uof s engineering(312年。w d.tex10。见过——uof工程).doc
- 504planforgrade4-childrenwithdiabetes.doc
- 1118 installsewagepumpstations- home n z q a(1118 installsewagepumpstations - n z问).doc
- 1996 pollution prevention partnership(1996年污染防治合作).doc
- 2005 beam pumping system workshop- a l r d c- home(2005游梁式抽油机系统研讨会- l r d c -回家).doc
- 2007 basketball rules mechanics examination- s c h s l(2007年篮球规则力学考试c h s l).doc
- 2013 consumer confidence report form(2013年的消费者信心报告形式).doc
原创力文档

文档评论(0)