subcontractorconstructionsafetysite-specificsafetyplanform(17页).docVIP

subcontractorconstructionsafetysite-specificsafetyplanform(17页).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
subcontractorconstructionsafetysite-specificsafetyplanform(17页)

Project Title SECTION 1 - PROJECT DESCRIPTION EMERGENCY CONTACTS Subcontract / Purchase Order Number Project Start / End Dates Start: Complete: Project Location General Scope of Work, Project Description FOR ALL EMERGENCIES CALL: Emergency Contact number: 7911 - or - (510-486-7911) or 911 from a cell phone. For all incidents, injuries, property damage, near-misses, work-induced illness or chemical over-exposures, the following personnel MUST be immediately contacted upon scene stabilization, but in all cases within one hour: Project Personnel Name Phone Number(s) Email Project Manager Construction Manager Project EHS Point of Contact OTHER CONTACT INFORMATION Subcontractor Project Manager Subcontractor Site Superintendent Subcontractor Health Safety Representative ** Subcontractors - Company Name Name of Designated Safety Representative ** Phone Number TBD TBD ** Attach a description of qualifications, or resume, for each Safety Representative per Section 9.0 plan attachments. SSSP REVIEWS Reviewed Approved by: (Subcontracted Company Officer) Subcontractor SSSP Reviewed by: (LBNL EHS ) Subcontractor SSSP Reviewed Accepted by: (LBNL Project/Construction Manager) Signatures and dates SECTION 2 - SUBCONTRACTOR POLICY STATEMENT SECTION 3 - ACKNOWLEDGMENT of 10 CFR 851 As a subcontractor to LBNL, while your workers are physically located at LBNL, you must meet the requirements of Title 10, Code of Federal Regulations, “Energy”, Part 851, “Worker Safety and Health Program” (10 CFR 851). As such, you must be aware of, and comply with, the requirements of this regulation. (Link to 10 CFR 851) Acknowledgment signature __________________________ I__________________________________, certify that that I have read the requirements of 10 CFR 851 and attest that my firm and its sub-tier contractors will comply with the requirements of 10 CFR 851. Yes No MEDICAL SURVEILLANCE AN

文档评论(0)

Bnr310822 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档