userrequirementstemplate-ispe(29页).docVIP

  • 11
  • 0
  • 约2.96万字
  • 约 29页
  • 2017-01-19 发布于湖南
  • 举报
userrequirementstemplate-ispe(29页)

User Requirements Template for a DEPYROGENATION TUNNEL REVISION HISTORY Rev. Date Approval Revision Summary 1 10/29/2003 Petro Revised items 3.4.2.2 3.4.3.2 – Corrected the average airflow velocity rates. The rate was listed as typically 50 m/sec. The value was corrected to be 0.5 m/sec. 0 09/15/2003 Petro Initial Release (Reminder of Page Intentionally Left Blank) Table of Contents 1.0 Introduction 4 2.0 Overview 5 3.0 Operational Requirements 5 3.1 Capacity 5 3.2 Process Requirements 5 3.3 Process Control 6 3.4 Functions 7 3.5 Data and Security 13 3.6 Environment 16 4

文档评论(0)

1亿VIP精品文档

相关文档