ATTACHMENT 65001.13 INSPECTION OF ITAAC-RELATED INSTALLATION OF LOAD HANDLING EQUIPMENT AND FUEL RACKS PROGRAM APPLICABILITY: 2503 65001.13-01 INSPECTION OBJECTIVES 01.01 To determine whether installation activities of both New Fuel Storage Racks (NFR) and Spent Fuel Storage Racks (SFR) are in accordance with the Design Control Document (DCD), Final Safety Analysis Report (FSAR), industry code requirements, owner and vendor approved procedures, and regulatory requirements. 01.02 To determine whether installation of Refueling Light Load Handling and Overhead Heavy Load Handling