模具公司质量手册QM-6.0-M5A-E..doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
模具公司质量手册QM-6.0-M5A-E.

6.1模具核心过程: 工模厂运作流程图 6.1.1客户要求的确定Determine customer’s requirements 总经理应确保对与客户和其他相关方相互认可的有效和高效的沟通过程作出规定,并实施和保持这样的过程,以确保充分理解相关方的需求和期望,并将其转化为内部要求。同时确保评审活动能证实本公司有能力满足这些要求。 The GM should specify an effective and efficient communication process to communicate with customer and related parties. The process should be implemented and maintained to understand related parties’ requirements and expectations and transform them into the company’s requirements. Ensure to prove that the company has the ability to meet the requirements. 具体要求:Specific requirement: 市场部应组织相关人员确定: Marketing department should organize related personnel to determine, ? 客户规定的要求,包括对模具交付和交付后维修保养的要求,若客户没有提供书面要求, 在接收要求前应对客户要求进行确认; Requirements specified by customer such as requirements on mold’s delivery and after-sales services. If customer doesn’t provide hard copy requirements, then the requirements should be confirmed before accept. ? 客户虽然没有规定,但模具使用所必需的要求,包括公司内部确定的任何有关模具的规格 要求; Requirements not specified by customer but necessary for mold’s performance and requirements specified by the company on mold specification. ? 与模具有关的法律法规要求,如安全性; Laws and regulations requirement related to mold such as security. ? 确定要求后,市场部应组织相关人员评审这些要求,包括:模具技术要求、设计能力和周 期、品质要求和检测能力、模具制作能力和周期及物料配合并与客户沟通; After determine the requirements, marketing department should organize related personnel to review these requirements including mold technology requirements, designed capacity and cycle, quality requirements, inspection ability, mold manufacturing ability and production cycle and material coordination. The above information should be communicated with customer. ? 评审并确保以下方面得到满足后才向客户承诺和签订合同: Review the following requirements, only they are met can contract be signed. -模具要求已得到规定; The mold requirements have been specified; -与以前表述不一致的要求均已解决; Requirements inconsistent with previous requirements have been solved. -有能力满足规定的要求。 Has the ability to meet the specified requirements. ? 评审的结果及后续措施,市场部应作好并保存相应的记录。 Review result and the fol

文档评论(0)

fglgf11gf21gI + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档