Case Studies and Other Classroom Reality Shows Session III: Preparing Case Studies John Casey School of Public Affairs john.casey@ The Dam A new industrial/manufacturing area is to be built, which will be available to operate at full capacity in 5 years.To supply the needed water and power to the industrial area, it has been decided to build a dam on a nearby river. A dam of this scale will take 5 years to build. Initial surveys have indicated that there are two possible locations for the dam, but without further survey work – which will take one year to complete – there is a risk that t