- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
设备采购标的价值工程评标法2
the Valuable engineering evaluation method of Equipment procurement bidding
Tian Jiefang
(Hebei united university college of civil and architectural engineering)
Abstract: The bidding assessment is an important link in the bidding process,.But the current evaluation methods still exist some problems. Using the principle of value engineering is the best way to match the functions and cost, to realize the reasonable combination of technology and economy and to choose the winning bidder. This paper discusses the application of value purchase equipment tendering methods and steps of engineering evaluation, and illustrates how its application.
Keywords: equipment procurement; value engineering; bid inviting; bid evaluation
The bidding law of the Peoples Republic of China has made mandatory regulation for project bidding equipment procurement. Equipment procurement bidding is competitive for the characteristic. For the bid invitation unit, its purpose is to choose an ideal supplier from so many suppliers. And the most important key lies in the bid assessment. The bid assessment is a crucial link in the whole bidding process , and the evaluation methods formulated is the key of the bid evaluation work. Different evaluation methods can sometimes lead to different winning bidders. Scientific, rational and fair evaluation methods are very important for the bid invitation unit to calibrate and latter signing of contract and fulfilling the obligation on a contract.
Because the public bidding system in our country has been put into practice just for a short time,there are many imperfections in the practice, especially in the bidding methods.
1. the main problems existing in equipment procurement bids
Current equipment procurement of tender evaluation methods mainly has some methods. They are the lowest bid price method, the comprehensive evaluation price method, comprehensive pointrating method and so on. The main problems existing in the practice are as follows:
您可能关注的文档
最近下载
- 水泥厂余热锅炉调试报告.pdf VIP
- 2024-2025年中国铁氧体软磁材料行业市场调查研究及投资前景预测报告.docx
- 2025秋统编版(2024)小学道德与法治三年级上册(全册)课时练习及答案(附目录).docx
- 我眼中的中国平安.docx VIP
- 公路工程沥青新旧试验规程差异对比解读-JTG 3410-2025.pdf VIP
- 《气体传感器简介》课件.pptx VIP
- 自治区矿产资源开发利用与生态保护修复方案编制提纲(试行).doc VIP
- 粘贴钢板加固施工方案.docx VIP
- 碳排放权交易有关会计处理暂行规定(2025).docx VIP
- Fisher阀门结构与维护.ppt VIP
文档评论(0)