- 7
- 0
- 约2.89万字
- 约 8页
- 2017-01-30 发布于湖南
- 举报
Sr. No. Item Description Unit Qty. Rate
(Rs.) Amount
(Rs.) WATERPROOFING : (i) All the work has to be carried out by the approved specialist agency as shown at the end of the Notes (ii) Fifteen (15) years performance guarantee on requisite stamp paper has to be furnished by the main contractor backed-up by the manufacturer (iii) Unless otherwise specified, the rate quoted shall include for the following
All material, labour, workmanship and sequence of operation as specified by the specialist agency.
Necessary scaffolding to work at all levels.
Curing for a minimum period of
您可能关注的文档
- add title27, division3, subdivision2, chapters1,2,3,4(添加title27、division3 subdivision2 chapters1,2,3,4)(10页).doc
- add title27, division3, subdivision2, chapters1,2,3,4(添加title27、division3 subdivision2 chapters1,2,3,4).doc
- activity2.1.3 utility shed design guide( revit2011)(activity2.1.3效用流设计指南(revit2011))(20页).doc
- agricultural mechanics- c a t a(农业机械- c a t)(13页).doc
- activity2.1.3 utility shed design guide( revit2011)(activity2.1.3效用流设计指南(revit2011)).doc
- airbussimulatorcalloutsandbriefingguide.doc
- airbussimulatorcalloutsandbriefingguide(26页).doc
- alaska departmentof environmental conservation(阿拉斯加departmentof环境保护)(5页).doc
- alaska departmentof environmental conservation(阿拉斯加departmentof环境保护).doc
- advanced manufacturing- science, technology, engineeringand(先进制造,科学、技术、engineeringand).doc
原创力文档

文档评论(0)