无锡世贸广场项目F地块概要
无锡世贸广场项目F地块
土建总承包工程
施
工
组
织
设
计
目录
第一章 工程概况···································1
1 工程建设概况··············································1
2. 建筑概况·················································1
3 主体结构概况··············································2
第二章 工程特点及管理策略···································3
第三章 施工组织部署········································5
1、工程管理目标··············································5
1.1、工期目标·················································5
1.2、质量目标················································5
1.3、安全文明施工目标········································5
1.4、环境和职业健康管理目标··································5
2、现场组织机构·············································5
3、施工段划分及施工总安排···································6
第四章 施工计划大纲及资源投入计划表························7
1、施工进度计划·············································7
1.1施工进度计划见附图·······································7
1.2、机具、设备、周转料具和劳动力配置计划····················7
2、进度保证措施·············································9
第五章 施工总平面布置······································12
1、布置原则·················································12
2、垂直运输设备布置·········································12
3、临时用水用电布置·········································12
3.1、临时用水················································12
3.2、临时用电················································12
施工用水及污水排放·······································14
主要施工方案········································15
施工步骤·················································15
工程测量················································17
基坑围护及基坑开挖
地下室防水施工
模板工程
钢筋工程
混凝土工程
脚手架工程
砌体工程
屋面工程
工程质量、环境和职业健康安全管理
工程质量管理计划
1.1、本项目质量目标
1.2、本项目质量保证体系
1.3、本项目质量控制流程
1.4、本项目质量查核表
1.5、质量保证措施
工程安全管理计划
2.1、本项目安全管理目标
2.2、本项目安全保证体系
2.3、本项目安全管理流程
2.4本项目安全查核表
2.5本项目重点部位的安全措施
2.6、应急准备和响应
土地环境管理计划
3.1本项目环境管理目标
3.2、本项目环境管理体系
3.3、本项目环境管理流程
3.4、本项目重要环境因素台帐及环境查核表
3.5、土地环境整顿措施
总承包管理实施方案
总承包管理模式
1.1施工内容
1.2、协调内容
总承包管理组织机构
2.1、重要岗位职责
2.2、项目职能部门及其职责······································15