- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
冷箱珍珠岩保温处仪表连接要求
PAGE DE GARDE / FRONT PAGE Rev. Date Supervis. Appr. Modifications 0 05.09.94 WEWER Emission Originale/Original Issue
Supersedes RG.321.80
a 02.11.94 WEWER Pages 2,4 to 9 updated b 21.03.97 WEWER Reaffirmed in Microsoft( WORD( c d e f g h i j k l m n p CONTENTS
1 GENERAL : EQUIPMENT GENERAL : EQUIPMENT
Manual Analyses or Sensors
Simple or differential Pressures
Level Gauges on Columns
Gas and Liquid Flowmetering
Gas and Liquid Analyses
Temperature Probes
For standard installation and mounting design refer to GR.350-11 and GR.350-61.
DESIGN OF THE CONNECTIONS
The design is carried out by the piping contractor.
Study of the Routing
The study must be started upon completion of the piping lay-out. It allows : - defining the orientation of the nozzles on the column sections and the casing penetration areas, - -selecting the general option for the routing of the tubes and cables, - -grouping the instrumentation nozzles - -in the special case of tubing for liquid analysis with capillary tube, provide a distance of or = 1000 between the nozzle and the casing wall, if possible (see GR.350.61 mounting 11A).
Collective Routing Principle
The tubes and cables are preferably placed on the inside of the casing wall forming a strand which is held by a stainless steel clip, and come out at the lowest point possible (see chapter 2.3). The routing is traced on a main piping drawing, taking into consideration the following points : - the areas of grouped nozzles, - inspection doors in the casing and ladders on the inside, - casing penetrations.
Routing for connections and casing penetrations.
EXECUTION OF THE CONNECTIONS
Routing
The routing of the tubes and cables consists of :
an individual routing between the nozzle and the casing,
a possible individual routing up to the collective routing,
a collective routing en botte.
Supports of collective routing
Tubes will be installed in c
文档评论(0)