planninganewironoremine.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
planninganewironoremine

Planning a New Iron Ore Mine J.E. Everett Adjunct Professor, Centre for Exploration Targeting, University of Western Australia, Nedlands 6009 jim.everett@uwa.edu.au (618) 9386 2934 Planning a New Iron Ore Mine ABSTRACT Over recent years Australia, and in particular Western Australia, has been insulated from the global financial crisis by China’s continuing insatiable demand for minerals, in particular iron ore. In Western Australia the demand has led to a number of new mine prospects being evaluated. This paper discusses the evaluation process for a projected new mine. When samples from a grid of drill holes have identified a potential iron ore prospect, a block model of the ore body is prepared by statistical interpolation of the drill hole data, and is used to plan the mine. The first requirement is to identify ore to be extracted, leaving behind waste, so as to meet target grade, generally in multiple analytes. Commonly this is done by setting cut-off values on each analyte to distinguish ore from waste: it will be shown that, if more than one analyte is important, this procedure is wasteful of ore and a composite cut-off function is preferable. A second requirement is to sequence the ore extraction so that the variability in ore grade is controlled: failure to do so will result either in low-quality ore being marketed, or excessive re-handling being required to blend the ore to reduce the grade variability. A third requirement is that the extraction sequence should be such as to control the amount of equipment movement required, enhancing the equipment productivity. The overall objective, to optimise the Net Present Value (NPV) of the mined ore, is simply stated but complex in realisation, since so many factors, such as target grade, grade variability, equipment choice, equipment movement, and downstream blending all have alternatives which can be traded off against each other, and all of which contribute to the costs and benefits making up the total NPV. This

文档评论(0)

jvdodnnv002 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档