- 1、本文档共18页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Figure 1.1Schematic representation of Power ‘supply chain’In the coming sections we will review some of the literatures which have adopted optimization techniques for Power generation, transmission and distribution.2. Optimization Techniques for Power Generation2.1 Optimal scheduling of hydrothermal plants27Mandalet al.27 demonstrated application of nonlinear programming to determine the optimal operation schedule for subsequent periods. As the operation cost of hydrothermal plants are very low, this problem is simply a nonlinear program to reduce the amount of coal used in thermal plants in power supplysystems with nonlinear constraints. The objective function and constraints of such problem are as described below.Objective function:Where F is the total cost, T is the time intervals for scheduling horizon, Ns represent number of thermal power plants and Psit is the amount of power generated in ith plant.Constraints:Demand Constraint: Total production has to meet the demand after certain unavoidable common losses.Power generation constraints: There will be minimum and maximum amounts of power that can be generated from either any of the hydro or thermal plants. And in case of hydro plants the generation amount is the function of water discharge rate and reservoir storage capacity.Storage constraints: We also have constraints based on water dynamics and storage capacities of various hydrothermal plants and water discharge rate limits based on the strength of the plant. They can be framed as follows:As you found that it is a cumbersome model, so because of recent studies in this area, recent heuristic development much useful in these cases is Particle Swan optimization model (PSO). It is time and population based model where its population changes places from time to time. The algorithm runs around the whole multidimensional region in order to find the optimum solution. Each particle adjusts its own position based on its experience along with its neighbor’s experien
您可能关注的文档
- NAETI四级笔译复习资料【DOC精选】.doc
- n-unit【DOC精选】.doc
- M项目中文规格书【DOC精选】.doc
- name card pictures【DOC精选】.docx
- Narrowband optical filter design for DWDM communication applications based on Generalized Aperiodic【DOC精选】.doc
- NAPOLEON CHOCOLATE BAR【DOC精选】.docx
- NASA对于的解释【DOC精选】.doc
- NATO软件复用标准简介【DOC精选】.doc
- natural killer cell therapy【DOC精选】.doc
- NAT技术及配置指南【DOC精选】.doc
- DB32_T 3666-2019家庭服务 母婴护理员(月嫂)服务规范.docx
- DB32 4682-2024预制舱式磷酸铁锂电池储能电站消防技术规范.docx
- DB3212/T 1152-2024公共机构能源资源消费统计管理规范.docx
- DB3213_T 1041-2022 服务业用水定额.docx
- DB3203_T 1043-2023 社区居家医疗护理服务规范.docx
- DB32/T 4661-2024 110kV全户内金属结构变电站雷电防护设计规范.docx
- DB3201_T 1167.2-2023 放心消费示范单位创建规范 第2部分:街区.docx
- DB32/T 4705.2-2024口罩 有毒有害物质的测定 第2部分:禁用偶氮染料.docx
- DB3212_T 2001-2019 鹅林下养殖技术规程.docx
- DB3213T 1023-2021 莴苣-丝瓜-豇豆周年生产技术规程.docx
文档评论(0)