SiDIRLayoutMBreidenbachPBurrowsTMarkiewicz.pptVIP

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
SiDIRLayoutMBreidenbachPBurrowsTMarkiewicz

SiD IR Layout M. Breidenbach, P. Burrows, T. Markiewicz SiD Collaboration Meeting 16-17 December 2005 Fermilab 2005.10.11 Discussion SiD Dimensions from 2005-05 files Barrel radius=6.450m Barrel half-length=2.775m EC Yoke=3.12m thick EC Yoke ends at 5.895m=2.775+3.120m Garage assembly requirements 3m shielding wall between beamline position garage Assuming self-shielding [which seems OK: see L. Keller, 2005.12.13 SLAC BDS mtg.] wall needed for commissioning only 5m free space between shield wall rotated barrel yoke3 2m free + 2m assembly fixture+1m free 4m free space between rotated barrel yoke rotated barrel HCAL 1m free + 2m assembly fixture+1m free 5m free space between rotated barrel HCAL pit wall 2m free + 2m assembly fixture+1m free Detector Access Guesstimates Door support leg overhang= 3.2m~25% door height (=barrel diameter=12.9m) Door opening= 3.0m Free space to walk around door ends= 1.9m Reserved radius = 8.0m (6.45 iron +1.55m services) Free space between dressed barrel pit walls= 2.0m PACMAN annulus= 3.0m [1m Fe, 2m concrete] Other Tunnel diameter 3.2m Assumed beam height=Barrel radius + 1m SiD closed, on beamline, in 20m x 28m R20 Detail SiD open, on beamline, in 20m x 28m Half SiD in 48m x 28m IR anamorphic scale SiD (closed) in 48m x 28m IR x-scale=y-scale Elevation View Pit Elevation: 30m ? 1.000 Barrel-floor 12.90 Detector diameter 12.90 Free space above detector 3.000 Crane bridge and hook Remaining Issues Door opening sequence If 3.0m long PacMan moves over leg (how?) to outside 55cm clearance between door radius and PacMan seems marginal On Shielding wall side, assuming shielding not needed after commissioning, infinite space available On far side of garage, 10m is arbitrary 12m is approximate maximum for 2 IR Baseline Configuration Push-Pull not analyzed yet Maybe move it out radially, then back (in z) to tunnel wall 5.105m long PacMan either stays in position, surrounding final doublet/crab support platform, or itself opens radially t

文档评论(0)

118books + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档