便民服务中心施工组织设计方案.doc
目 录
第一章 编制依据、工程概况及施工目标···························4
一、编制依据···············································4
二、工程施工使用的规范、文件································4
三、工程概况及施工目标·····································5
第二章 施工管理部署···········································6
一、施工准备工作计划········································6
二、施工总体构想············································7
三、施工管理················································8
四、项目部管理组织及班子配备································13
五、项目主要岗位职责·······································13
第三章 施工现场总平面布置·····································16
一、施工现场平面布置原则···································16
二、施工现场布置···········································17
三、施工用电布置···········································17
四、消防器材布置···········································18
第四章 主要施工方法···········································18
第一部分 室内安装··········································18
一、内脚手架搭设施工技术··································18
二、轻钢龙骨石膏板吊顶施工方法···························19
三、材料及主要机具········································21
四、石材墙柱面干挂施工方法································23
五、墙地面防水施工方法····································26
六、石材楼面地面施工工艺·································26
七、细石、砼楼地面施工工艺·································31
八、玻璃隔断工程·········································33
九、木门制作安装施工工艺·································37
十、油漆涂刷施工方法······································40
十一、拆除工程施工技术···································40
第二部分 钢结构夹层加固施工方案····························41
第三部分 电气设备、生活排水、综合布线工程····················44
一、电气设备安装工程施工方法·····························44
二、生活排水安装工程施工方法·····························46
三、综合布线工程安装··················