英文_布勒机械施工组织设计五冶金建设.doc

英文_布勒机械施工组织设计五冶金建设.doc

  1. 1、本文档共54页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
英文_布勒机械施工组织设计五冶金建设.doc

Construction, Organization Design for Temporary Facilitates A in the Relocation Project of Wuxi Buhler Machinery Plant Quotation Proposal No.5 Metallurgical Construction Corporation of China, Wuxi Subsidiary 2008.8.24 Content ChapterⅠ General information and features of project and analysis of difficulties I. General information of project II. Construction features and analysis of difficulties ChapterⅡ Project targets and control of Construction schedule I. Project target II. Control of Construction schedule Annex: Construction preparations and entry plan Annex 1: Plan and allocation of labor Annex 2: List of main machines for road ground works Annex 3: List of main machines expected for civil construction Chapter III Construction deployment and general layout I. Construction deployment II. Construction project management and organization III. Construction preparation IV. Construction layout 1. Overall layout design 2. Layout of temporary facilities 3. Temporary electricity layout for construction 4. Temporary water supply and drainage system layout for construction 5. Mark Chapter IV Major construction formula and key work stages A. Temporary matching construction works I. Engineering surveys II. Main process flow the works III. Earth works IV. The foundation works V. Steel structure VI. Ground works IX. Installation of aluminum alloy doors and windows B. Road construction 1. Road construction I. Main working procedure of road construction II. Construction formula of earth works of road bed and curbstones C. Water/electricity systems outdoors 1. Main construction procedures 2. Sewerage system outdoors ChapterⅤ Project Quality Control Plan 1. Quality target 2. Measures to guarantee engineering quality 3. Process control of construction quality I. Process control of construction method II. Process control of material supply III. Process control of tests IV. Control of non-conformity products V. Corrective and preventive measures VI. Handling,

文档评论(0)

店小二 + 关注
实名认证
内容提供者

包含各种材料

1亿VIP精品文档

相关文档