- 1、本文档共38页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Review the Supplier Quality SOR GM 1927-3 and make sure the supplier has copies of each of the documents listed and understands the requirements If meetings are required for additional explanation of any of the requirements it is recommended that dates for the meetings be set at this Kick-Off meeting / Pre-Production Meeting this will ensure the supplier fully understands the requirements Request a signed copy of page 5 from the Supplier Quality SOR This request should have been in a list of items in the suppliers pre-work or Kick-Off meeting notice listing all items required at the Kick-Off meeting / Pre-Production meeting Confirm in the APQP Kick-Off meeting notification letter that the supplier should be prepared to review any of the items listed in the Required Quality letter GM 1927-4 With the letter on the screen explain the following: If there are any items you as the SQE would like reviewed from this letter they should be reviewed at this time If the supplier has not supplied these documents prior to Sourcing they should be prepared to review each of them at this meeting Show the GM forms listed and explain what ever sheets you are most comfortable with Explain that this Timing Chart is an expansion of the APQP Project Plan GM 1927-1 Be clear that there is not a ONE FOR ONE correlation between the APQP Timing Chart GM 1927-2 and the APQP Project Plan GM 1927-1 the reason for this is because the Timing Chart GM 1927-2 was developed to meet requirements for the GQTS APQP Tracking system This form as it is developed can be used and updated manually until the GQTS APQP Tracking system is implemented (remember the system is targeted for 3rd or 4th quarter 2000) The first 8 items listed on the APQP Timing Chart GM 1927-2 are significant program timing milestones (GM1927-4 is Included in all GM RFQs. Supplier submits as part of Quote to GM, includes requested documents. Review Supplier Quality Information provided and discuss exceptio
您可能关注的文档
- 通信原理实验.doc
- 太原钢结构冬季施工方案.doc
- 太原管廊PPP部分合稿-第二分册—运行维护方案.doc
- 太原汇发元宵活动方案.ppt
- 太原理工大学_WEB系统与技术试卷2016_04_25.doc
- 太原神瑞HYZ4型正压氧气呼吸器课件.ppt
- 太原市容积率建筑密度的计算规则.doc
- 通信专业SDH传输试题及答案.doc
- 通信专业实务初级+通信专业综合能力初级.doc
- 通信专业实务传输与接入(中级).doc
- 两个相干源产生波具有3b chmc.pdf
- wifi高性能模块ce fcc rohs认证-xrf report电子档.pdf
- linux pci multiport installation manual多端口安装手册.pdf
- 二章基本概念理论.pdf
- 互联网工程任务组ietfs turnerrfc5940 txt.pdf
- mtz0数学高级证明集合关系群mathematics paper 3 sets relations and groups french.pdf
- 网上书店需求规格说明.pdf
- 系统测试用例pcweb终端.pdf
- apv1 keil环境下接口兼容问题.pdf
- 2023届江西省八所重点中学高三3月联考英语试题(原卷版).docx
文档评论(0)