Sample
Bill of Quantities工程量清单
A. Preamble 前言
1. The Bill of Quantities shall be read in conjunction with the Instructions to Bidders, General and Special Conditions of Contract, Technical Specifications, and Drawings.
本工程量清单应连同投标人须知、合同的通用和专用条件、技术规范以及图纸一并进行阅读。
2. The quantities given in the Bill of Quantities are estimated and provisional, and are given to provide a common basis for bidding. The basis of payment will be the actual quantities of work ordered and carried out, as measured by the Contractor and verified by the Engineer and valued at the rates and prices bid in the pri
您可能关注的文档
- 工程地质实习选读.doc
- 工程地质实习-选读.doc
- 工程地质选读.doc
- 工程地质与土力学复习题选读.doc
- 工程地质原理选读.doc
- 工程粉刷石膏施工方案选读.doc
- 工程概预算-设计上交文件选读.doc
- 工程估价实训用表选读.doc
- 工程管理制度选读.doc
- 工程规模标准选读.doc
- 2024-2025学年湖南省邵阳市新宁县回龙寺镇人教版一年级下册期中测试数学试卷.docx
- 2024-2025学年山东省德州市平原县王杲铺中小、王凤楼中小、腰站镇中小青岛版一年级下册3月月考数学试卷.docx
- 第四单元 课题3 物质组成的表示-初中化学新教材预习学案(人教版2024九年级上册).docx
- 2024-2025学年山东省济宁市梁山县人教版一年级下册期中测试数学试卷.docx
- 2024-2025学年山东省德州市德州经济技术开发区长河小学等校青岛版一年级下册期中考试数学试卷.docx
- 2026《基于国产开源单片机GD32VF103的输变电设备物联网传感器设计》8300字.docx
- 2024年中考道德与法治真题完全解读(北京卷).docx
- 2026《基于机器视觉识别的工件边缘曲线重构方法分析》9000字.docx
- 课时9.4 物体的浮与沉【一大题型】八年级全一册物理(沪科版2024).docx
- 2024-2025学年广东省江门市开平市人教版一年级下册期中综合素养评价数学试卷.docx
原创力文档

文档评论(0)