- 4
- 0
- 约4.63千字
- 约 24页
- 2017-03-09 发布于上海
- 举报
WECC Governor Responsive Reserve DataWECC州长储备响应数据
Frequency Response Basics (Using a 1400 MW generation loss event as an example) Frequency Response Basics August 4, 2007 1744 Hours Event Frequency Performance ERCOT May 15, 2003 Event ERCOT May 15, 2003 1453 Event Frequency Recordings from Different Locations within the Western Interconnection Following the Sudden Loss of a Large Generator Basic Representation of System Frequency Governing Illustration of Frequency Response for a 3% generation loss Simple Test System Different speed of reponse of “responsive” units Nadir Frequency will greatly depend on how reserves are allocated Importance of Deployment Rate Frequency Response Sustainability 2,812 MW RAS event June 17, 2002 2,815 MW RAS event on May 20, 2008 West Wing fault in Arizona on June 14, 2004:3,900 MW lost at 0 seconds on plot scale West Wing fault in Arizona on June 14, 2004: Captain – Jack – Olinda 500-kV line was out of service during the disturbance Find the original spread sheet and plot without grey background Draw the Florida UFLS setting line at the time of the event Add a text box with the calculation of NERC frequency response for the event. Change title to add that this was a Saturday and the time of the event. Format this to be consistent with other exibits. This is a backup slide just in case we need it. Add lines and text boxes to illustrate the Proposed NERC time frames of: Arresting period Rebound Period Settling Period Recovery Period * Slides for FR Technical Conference Office of Electric Reliability September 2010 Page * Source: 2010. NERC Overview of Frequency Response. NERC A B1 B3 B2 FRCC Under-frequency load shed level Arresting Period Rebound Period Recovery Period ERCOT UFLS level Source: ERCOT Source: ERCOT Source: MISO Reliability Subcommittee Source: MISO Reliability Subcommittee Source: MISO Reliability Subcommittee Source: Courtesy of Genscape Page * System size is 100 GW 3 GW of generation tripped All generators have inertia of 4 seconds Load damping D=1 Baseloaded ge
您可能关注的文档
- VIVI. La Misa, paso a paso Liturgia de la Palabra y .ppt
- Viva Las Vegas marc拉斯维加斯马克.merlins.ppt
- Vladimir N弗拉迪米尔. Vapnik’s The Nature of Statistical .ppt
- VO2 Max iws2VO2 max iws2.collin.ppt
- VLSI Floorplanning with Boundary Constraints Based on CornerVLSI布图规划基于角点边界约束.ppt
- VOCAB 1A Wikispaces词汇表1A wiki空间.ppt
- Vocabulaire 8词汇 webmail.hcboe.net.ppt
- vocabulario de actividades de tiempo de invierno By 词汇的冬季活动的时间由.ppt
- Vocabulario 55的词汇.1 mohrspanish.wikispaces.ppt
- Vocabulario de la familia WKU家庭wku词汇.ppt
- 广东省广州省实验中学教育集团2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 广东省广州大学附属中学2025-2026学年八年级上学期奥班期中物理试题(解析版).docx
- 广东省广州市第八十六中学2025-2026学年八年级上学期期中物理试题(含答案).docx
- 广东省广州市第八十九中学2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 广东省广州市第二中学2025-2026学年八年级上学期期中考试物理试题(含答案).docx
- 广东省广州市第八十六中学2025-2026学年八年级上学期期中物理试题(解析版).docx
- 广东省广州市第八十九中学2025-2026学年八年级上学期期中考试物理试题(含答案).docx
- 广东省广州市第二中学2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 2026《中国人寿上海分公司营销员培训体系优化研究》18000字.docx
- 《生物探究性实验教学》中小学教师资格模拟试题.docx
原创力文档

文档评论(0)