requirementspecifications.docVIP

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
requirementspecifications

REQUIREMENT SPECIFICATIONS Section A: General Specifications General The Contractor shall comply with the Specifications and all provisions in the Contract document. During the progress and upon completion of any Services or Works, the Contractor shall ensure that the site is clean and shall remove expeditiously from the site debris and rubbish generated by the Works and properly dispose of it before handing over to the University. Site Restrictions The Contractor shall note that the University remains in full operation during the whole of the Contract Period. With the presence of existing dwelling structures, dwellers, students/visitors, physical encumbrances and the site’s close proximity to other buildings and roads, the Contractor shall be deemed to have taken into consideration such site constraints and the probable effects on working hours and access. The Contractor shall ensure that the progress of the Works does not disrupt the flow of activities in the buildings and/or surrounding areas. The Contractor shall carry out a site survey and submit the site possession checklist. This completed checklist form shall be signed and returned to the University’s representative within five (5) working days prior to date of work commencement. The Contractor shall take all necessary precautions not to disturb existing wires, cables, services pipes, equipment in operation, sewers, trees, plants, flowers, etc. Any damage to such during the progress of the Works shall be made good at the Contractor’s expense. The Contractor shall make all necessary arrangement to maintain the existing facilities and have minimum of disturbances to the public and occupants. The Contractor shall deem to have allowed for all these provisions in the Contract. No claim on for these requirements shall be entertained by the University. The Contractor shall carry out the Works with due considerations on the existing site constraints at any time and under no circumstances whatso

文档评论(0)

jvdodnnv002 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档