- 1、本文档共69页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
sc-prditemnb11-0401,draft4-25-12
SC-PRD ITEM NB11-0401, Draft 4-25-12
Open Issues:
1. Editorial items
A. Renumbering needs to be checked
B. All cross references need to be checked/updated
C. Index not complete
D. Several tables did not import correctly
Organizational Comments:
1. Part 3 supplement 7 has been changed to main body text, and rearranged for flow
2. Administrative requirements moved after general repair requirements
Editorial/ other comments
Safety valve and safety relief valve changed to “pressure relief valve” where appropriate
“mounted” changed to “installed” in numerous locations
Organic fluid heater pressure relief requirements expanded based upon Section I of ASME Code
Does not include NBIC changes that have been approved by the committee but not yet published
Key:
Italics indicate new material written for this draft
Strikethrough indicates deleted material
(Parenthetical notes are for information only, and are not to be included in publications)
Document: NBIC Part 4 draft4-12.doc
NBIC PART 4
PRESSURE RELIEF DEVICES
Table of Contents
(TO BE COMPLETED)
1.0 Installation of Pressure Relief Devices
1.1 Pressure Relief Valves For Boilers
1.1.1 Valve Requirements — General/Definitions
Number
Location
Capacity
2.0 In-Service Inspection of Pressure Relief Devices
3.0 Repair of Pressure Relief Devices
(following index is incorrect)
1.7 Accreditation of “VR” Repair Organizations
1.7.1 Scope
1.7.2 Jurisdictional Participation
1.7.3 General Rules
1.7.4 Repair of Nuclear Valves
1.7.5 Issuance and Renewal of the “VR” Certificate of Authorization
General
Issuance of Certificate
Renewal of Certificate
Review of Applicant’s Facility
Verification Testing
Verification Testing Alternatives
1.7.6 Use of the “VR” Authorization
Technical Requirements
Stamp Use
Return of Stamp
Multiple Locations
Certificate of Authorization Contents
Changes to Certificates of Authorization
Issuance of More Than One “VR” Symbol Stamp to a
Ce
您可能关注的文档
最近下载
- 长螺旋钻孔压灌混凝土旋喷扩孔桩施工方案.doc VIP
- 肺康复ppt优质课件.pptx VIP
- GB-50352-2019-民用建筑设计统一标准.pdf VIP
- 建设工程施工合同示范文本gf-2013-0201)协议书、通用条款、专用条款.docx VIP
- 高考语文阅读理解《鸭子》含答案.docx VIP
- 无菌检查用培养基灭菌后的保存有效期的验证方法.docx VIP
- 输变电工程标准工艺(变电工程电气分册)2022版.docx VIP
- 2025贵州省专业技术人员继续教育公需科目考试题库(2025公需课课程).docx VIP
- 抹灰砂浆规范.docx VIP
- 模具工劳动合同协议书.docx VIP
文档评论(0)