section1507116071.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
section1507116071

SECTION 15071/16071 SEISMIC RESTRAINT FOR MECHANICAL / ELECTRICAL SUPPORTS PART 1 - GENERAL 1.01 SECTION INCLUDES A. Seismic Requirements for single rod hanger supports for conduit, pipe and other similar systems. B. Seismic Requirements for trapeze type supports for cable tray, conduit, pipe and other similar systems. 1.02 REFERENCES Building Officials and Code Administrators National Building Code (BOCA), 1999 Uniform Building Code (UBC), 1997 International Building Code (IBC), 2000 California Building Code (CBC), 2001 Standard Building Code (SBC), 1999 Cooper B-Line SRS-02 – Seismic Restraints: Multi-Directional Bracing for Electrical Conduit, Cable Tray, and Mechanical Piping Systems. ANSI/NFPA 70– National Fire Protection Association (National Electrical Code) NFPA 13 – Installation of Sprinkler Systems NFPA 14 – Standpipe and Hose Systems QUALITY ASSURANCE General: The contractor shall provide pre-engineered seismic restraint systems to meet total design lateral force requirements for support and restraint of piping, conduit, cable trays and other similar systems and equipment where required by the applicable building code. B. Manufacturer: 1. System Supports/Restraints: Firms regularly engaged in the manufacture of products of the types specified in this section, whose products have been in satisfactory use in similar service for not less than 5 years. 2. Bolted framing channels and fittings shall have the manufacturers name, part number, and material heat code identification number stamped in the part itself for identification. Material certification sheets and test reports must be made available by the manufacturer upon request. C. Installer: Company experienced in performing the work of this Section. 1.04 SUBMITTALS Submit seismic force level (Fp) calculations from applicable building code. Submit pre-approved restraint selections and installation details from Cooper B-Line’s Seismic Restraint

文档评论(0)

jvdodnnv002 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档