Layout of Disposal Area.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Layout of Disposal Area

Method Statement for Disposal Area at Intake Valley No.1 disposal area is far from right abutment and there is a section of public road between them, so all kinds of factors and potential safety hazard will disturb construction. In addition, the width of D1 road is only 5m and the traffic is very busy, so the efficiency of transportation is not high. To speed up the excavation of right abutment and improve efficiency, we propose to develop a new disposal area at intake valley. Layout of disposal area Disposal area is proposed to be located at the valley near intake and with the occupation area of 28767.3 m3. The height of disposal material is 40m and with the elevation from EL.145.0m to EL.185.0m. It will finally form a platform with elevation of EL.185.0m. The total quantity of disposal material is 183637m3. The disposal area is used to stack disposal material from right abutment, D2 permanent road and intake. Disposal material will be dumped layer by layer and from bottom to top. A 2.5 wide berm will be set every 10m high. Excavator will be used to form a slope with gradient of 1:3. Big block stone will be used to protect the slope. Layout of construction road One construction roads are proposed to be set at disposal area. Q1 road is started from EL.132.0m up to EL.185.0m; Gradient will be no more than 11%. The road is 8m wide and its foundation is 10m wide. Drainage ditch will be constructed at inner slope near construction road. Its bottom is 100cm wide and top is 200cm wide. The drainage ditch is 50cm deep. 1.0m thick rock will be filled first at the bottom of disposal area and near nature slope, and then mixture of soil and rock will be filled. Please refer to layout of disposal area for access road to disposal area. Preparation of construction Setting out Temporary bench marks which is led from control points III05 and III08 near disposal area will be used to set out for disposal. Points at the boundary of disposal area will be set every 5m elevation along o

文档评论(0)

panguoxiang + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档