- 1、本文档共44页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Failure in excavation is due to blocks of rock moving into the excavation two approach philosophies can be considered for stabilizations: The block displacements are occuring because the rock mass is a discontinuum, and hence the rock is reinforced so that it behaves like a continuum. Direct support elements are introduced into the excavation in order to maintain block displacements at tolerable levels. The first is rock reinforcement, the second is rock support. Note that with rock reinforcement the engineering elements are inserted within the rock mass and with support they are inserted within the excavation. 岩体的加固与支护的基本原理上的区别 The rock stabilization strategy can be based on the need to restrict the displacements as governed by the engineering objective. The ground response curve is a graph of the support pressure required to maintain equilibrium of the boundary at a given displacement value versus the displacement value. The ground response curves shown in following figure illustrate this relation for the cases of linearly elastic, ‘stable’ non-elastic and ‘unstable’ non-elastic behaviour. Because of the general nature of the ground response curve concept and te ability to study a variety of associated factors, it has become a widely used semi-empirical tool in the design of support for excavations. In fig.(b), the same rock mass is excavated by different methods. Curve 1 represents the ‘perfect’ excavation case, in which there is no disturbance of the remaining rock and there is no deviation from CHILE behaviour. Curve 2 may occur in a machine-driven tunnels, in which there is a slight disturbance to the remaining rock with the result of increased final displacement. Curve 3: high-quality blasting,more disturbance, displacement are increased yet further. All three of these curves intersect the boundary displacement axis which indicates that no support is required, providing the displacements are tolerable. Curve 4: poor-quality blasting,supporting is essential i
您可能关注的文档
- 15秋东财《管理学》在线作业技术分析.doc
- 2015年电工作业复习题库技术分析.doc
- 高层建筑施工题库.ppt
- 2015年电力安规考试——及技术分析.doc
- 15秋学期管理心理学在线作业技术分析.doc
- 高层建筑岩土工程勘察常见问题案题库.ppt
- 15秋中国医科大学《临床药物治疗学(本科)》在线作业技术分析.doc
- 15秋中国医科大学《外科护理学(本科)》在线作业技术分析.doc
- 高层建筑中的岩土工程勘察问题题库.ppt
- 15秋中国医科大学《外科学(本科)》在线作业技术分析.doc
- 2025年长沙银行浏阳支行社会招聘考试备考题库及答案解析.docx
- 2025年浙商银行成都分行社会招聘考试备考题库及答案解析.docx
- 2025中国农业科学院烟草研究所高层次人才招聘5人考试备考题库及答案解析.docx
- 2025中国冶金地质总局二局 国冶二局(福建)集团有限公司招聘10人考试备考题库及答案解析.docx
- 2025中国宗教杂志社招聘3人考试备考题库及答案解析.docx
- 2025年长沙银行益阳支行社会招聘考试备考题库及答案解析.docx
- 2025中国农业科学院农田灌溉研究所第二批招聘14人(河南)考试备考题库及答案解析.docx
- 2025中国农业科学院郑州果树研究所青年英才招聘3人考试备考题库及答案解析.docx
- 【统编版】高中语文必修上册第1单元2.1《立在地球边上放号》精美课件(23张PPT).pptx
- 【统编版】高一语文必修上册第一单元2.1《立在地球边上放号》优质课(26张PPT)课件.pptx
最近下载
- 2022年技术能手选拔赛试题调幅广播(含答案).docx VIP
- SL 489-2010_水利建设项目后评价报告编制规程.pdf VIP
- 2025甘孜州委统一战线工作部选调事业单位工作人员8人笔试备考试题及答案解析.docx VIP
- GB51251-2017 建筑防烟排烟系统技术标准 (正式版).docx VIP
- 2025广西公需科目考试答案(3套涵盖95-试题)一区两地一园一通道建设人工智能时代的机遇与挑战.docx VIP
- 机械电子工程系本科毕业设计指南.docx VIP
- 信息化系统安全运维服务方案设计.docx VIP
- 妇产科会阴按摩术.pptx VIP
- 中信大厦(中国尊)全生命周期管理路径探索及实践.pdf VIP
- 年春季高考数学真题.doc VIP
文档评论(0)