石油工程--生產工程.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
石油工程--生產工程.ppt

Perforating Bullet perforation is more effective in formation of low to moderate compressive strength, while jet perforation is generally better in rock with high compressive strength. A much safer well completion technique is to make the perforations after the tubing has been run and the packer set because the well is under absolute control at all times. Thru-tubing perforation has been made possible by the development of perforating devices small enough to run through tubing. Swabbing 抽吸法 Swabbing is a temporary operation that lower the fluid level in the well so that it can begin to produce If enough fluid can be swabbed (lifted) out of the tubing so that the pressure in the formation is slightly greater than the hydrostatic pressure of the fluid in the tubing, the oil or gas will start flowing immediately after the perforation are made. If the fluid does not flow after bring swabbed, a pump is installed as a permanent lifting device to bring the oil the surface. 生產工程 Production Engineering Production (Fundamentals of Petroleum , UT-Austin , Chapter V) 生產工程 (Definition of production) (1)將地層的流體(油或氣)由井底帶到地表。 ( bring the well fluid to surface) (2)將地表的流體作處理(例如:油氣分離), 以 作為輸送 到煉油廠之前的準備。 (preparing them for their trip through the pipeline to the refinery) 生產之階段(Stages或phases) (1)完井(complete the well)-- bring the fluid to the surface The first step is to complete the well - that is , to perform whatever operations are necessary to start the well fluids flowing to the surface (2)例行修護(Routine maintenance operations)-- doing whatever is necessary to keep the well producing (a)修復磨損及故障的設備 -- replacing worn or malfunctioning equipment, are standard during the wells production lift (b)Workover (修井) -- more extensive rep

文档评论(0)

170****0532 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8015033021000003

1亿VIP精品文档

相关文档