iDen_ALTK_PQE_Rev_.docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
iDen_ALTK_PQE_Rev_

Signatures on File Gregory Brookes Quality Assurance Manager Date German Malaret ALT Supervisor Date Stuart Warszycki Document Control Date Revision History Issue Date Revised By Description of Revision O 11/5/04 Stuart Warszycki Changed Specification number from 0009188T25 to PQE-110 to incorporate major changes to test flow. Modified Drop sections to reflect change to 4 foot drop height at room temperature. Removed Mechanical Leg of testing. Created new numbering scheme for environmental testing leg. Updated document sections to tailor to iDEN requirements. A 11/11/2005 Stuart Warszycki Created drop schedule table in Appendix F. Added information for Blue Tooth and EMI testing in sections 10.3, 10.6, and 13.4. Modified ESD section 12.3.1 for 12M09158A58 compliance. Added radio orientation information for first and second shaker table vibration in 12.3.2 and 12.8.2. Added ESD replacement radios in 12.3.1 and 12.8.1. Several syntax errors corrected. B 4/28/2006 Stuart Warszycki Changed ESD Section 12.3.1, as per Mobile Devices CR 2006-3. 2 of 4 ESD units tested in standby, while other 2 are tested in a call while connected to a power source. Updated Section 12.8.1 with similar criterion for ESD#2. CONTENTS Scope Product Submission Responsibility ALT Reliability Manager ALT Engineer/Technician Design Engineer Reference Documents Definitions and Acronyms Marking the Product Initial Inspection Charging the Units Programming the Units Testing 10.1 Functional Test 10.2 Signaling Test 10.3 Parametric and Blue Tooth Test Specifications 10.4 SQE Testing 10.5 Camera Testing 10.6 GPS 11. Tests Between Stresses to Capture Failures 12 Environmental Sequence 12.1 Thermal Shock 12.2 First Drop Sequence 12.3 First Parallel Shaker Ta

文档评论(0)

panguoxiang + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档